Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:35 02 May 2024
* Protesters held as asylum seekers' transfer thwarted
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
2nd May (1999)
Last special train to Weymouth Quay (*)

Train RunningCancelled
17:03 London Paddington to Penzance
17:54 Cardiff Central to London Paddington
20:56 Cardiff Central to Bristol Temple Meads
21:59 Cardiff Central to Bristol Temple Meads
22:30 Cardiff Central to Bristol Temple Meads
23:30 Cardiff Central to Bristol Temple Meads
Short Run
16:19 Carmarthen to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:23 Swansea to London Paddington
16:35 London Paddington to Plymouth
16:48 London Paddington to Swansea
16:50 Penzance to Cardiff Central
17:18 London Paddington to Swansea
17:23 Portsmouth Harbour to Cardiff Central
17:27 Cardiff Central to Portsmouth Harbour
17:59 Cardiff Central to Penzance
18:10 Taunton to Cardiff Central
18:18 London Paddington to Swansea
18:18 Carmarthen to London Paddington
18:23 Swansea to London Paddington
18:24 Portsmouth Harbour to Cardiff Central
18:29 Gatwick Airport to Reading
18:30 Cardiff Central to Portsmouth Harbour
18:48 London Paddington to Swansea
18:59 Cardiff Central to Penzance
19:14 Taunton to Cardiff Central
19:18 London Paddington to Swansea
19:23 Portsmouth Harbour to Cardiff Central
19:30 Cardiff Central to Portsmouth Harbour
19:33 London Paddington to Worcester Shrub Hill
19:48 London Paddington to Swansea
19:56 Cardiff Central to Taunton
20:23 Swansea to London Paddington
20:24 Portsmouth Harbour to Cardiff Central
20:24 Exmouth to Cardiff Central
20:30 Carmarthen to Bristol Parkway
20:30 Cardiff Central to Portsmouth Harbour
20:48 London Paddington to Swansea
21:30 Cardiff Central to Frome
21:45 Penzance to London Paddington
21:48 London Paddington to Swansea
22:49 London Paddington to Swansea
Delayed
15:48 London Paddington to Carmarthen
16:15 Penzance to London Paddington
17:48 London Paddington to Carmarthen
An additional train service has been planned to operate as shown 18:22 Bristol Temple Meads to Portsmouth Harbour
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 02, 2024, 19:40:44 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[260] Vintage film - how valid are these issues today?
[80] Rail unions strike action 2022/2023/2024
[46] Leven, Fife, Scotland, fast forward a month
[42] Train drivers "overwhelmingly white middle aged men"
[34] underground plans for Bristol update.
[34] Visiting the pub on the way home.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 [3]
  Print  
Author Topic: GWR & SWR to run current timetable until May next year  (Read 6568 times)
RichardB
Hero Member
*****
Posts: 959


View Profile
« Reply #30 on: July 12, 2018, 11:38:17 »

Here's Mark Hopwood's e-mail, sent out this morning -

"You may have seen Monday’s media release by the Rail Delivery Group, confirming that timetable changes for December 18 have been postponed.  This includes GWR (Great Western Railway) timetable plans.

This is very disappointing news for customers. However, it is important that everyone is confident in the industry’s ability to deliver on timetable improvements as important as these, and although the delivery of trains and crew remains on track, it is clear from Network Rail’s recent review that there is some nervousness about the ability of the industry to deliver the new timetable in December 2018.

Given that position, we understand why Andrew Haines, new CEO (Chief Executive Officer) of Network Rail, has recommended holding off key aspects of the December 2018 timetable change to protect day to day journeys for customers.

Changes to track layout and depot access in December will mean the current GWR timetable cannot simply be extended, and some work to re-write timetables will be needed. We will be working with Network Rail to make sure both our planning team, and theirs, have the support and resource required to ensure a smooth transition for some changes in December, with a view to May 2019 for the main timetable recast.

While timetable changes are pushed back, we will continue to deliver the improvements promised customers from early 2019, like the continued roll out of the Intercity Express Trains – which are more reliable and have around 20% more seats than the High Speed Trains they replace. However, it is the timetable change that brings faster journeys and frequency improvements and it is these additional benefits that will be delayed.

We will be keeping in close contact with Network Rail and will keep you updated as things progress."
Logged
devonexpress
Sr. Member
****
Posts: 294


View Profile
« Reply #31 on: July 23, 2018, 00:22:20 »

This might be very bad news for SWR» (South Western Railway - about).

The new franchise was costed on an increase in services in December 2018. If the DfT» (Department for Transport - about) don't compensate FirstGroup/MTR then the already (rumoured) shaky financial predicament the franchise is in could be exacerbated.

Stagecoach/Virgin East Coast blamed Network Rail (so, by proxy blaming the Govt) for their financial predicament after being supposedly unable to introduce more services. They then defaulted when the government refused any sort of bailout.

It's quite feasible the same could happen to SWR.

Half the problem with a disintegrated railway, hopefully the new plan of TOC (Train Operating Company)'s running track and trains might help, but full privatisation is the best answer.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #32 on: July 23, 2018, 07:47:52 »

Half the problem with a disintegrated railway, hopefully the new plan of TOC (Train Operating Company)'s running track and trains might help, but full privatisation is the best answer.

I can see arguments that vertical integration could help, but full privatisation?   That seems to me more a matter of political or economic dogma. 

There is the argument that the government is doing so badly let the private sector take over, but then given the mind set of our government some will argue that they are doing so badly in order to give them an excuse privitise the whole thing. 

But then they couldn't keep their hands off it when it was privitised.   
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 [3]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page