Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 03:35 06 May 2024
* Starliner: Nasa to fly new craft to space station
* Train strikes: How May's disruption affects you
- Eurotunnel says no queues with new travel system
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (2011)
First tweet from GWR/FGW (*)

Train RunningCancelled
04:57 Plymouth to Gunnislake
05:00 Reading to Redhill
05:14 Taunton to Bristol Temple Meads
05:42 Gunnislake to Plymouth
05:55 Plymouth to London Paddington
06:43 Redhill to Reading
06:48 Cheltenham Spa to London Paddington
07:03 Bristol Temple Meads to Taunton
08:12 Bristol Temple Meads to Avonmouth
08:35 Plymouth to London Paddington
11:32 London Paddington to Cheltenham Spa
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
05:11 Gloucester to Southampton Central
07:10 Penzance to London Paddington
08:19 Taunton to Cardiff Central
08:23 Southampton Central to Bristol Temple Meads
08:46 Avonmouth to Weston-Super-Mare
09:59 Cardiff Central to Taunton
11:52 London Paddington to Hereford
12:10 Weston-Super-Mare to Severn Beach
13:11 Taunton to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:18 Hereford to London Paddington
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 03:35:12 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[142] Server load - 5th May 2024
[53] Problems with the Night Riviera sleeper - December 2014 onward...
[51] Walking between stations
[48] Something different !
[47] Champion to Westbury
[46] Visiting the pub on the way home.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: A new concept for third rail electrification.  (Read 11187 times)
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« on: January 08, 2019, 19:11:10 »

Without wishing to invoke the 'self praise is no recommendation' I have been known to come up with some good ideas in the past but none with such brilliance as to earn me my knighthood but heres hoping this idea will break the famine.

Has it ever been suggested that future third rail electrification schemes be controlled by the signalling system ?

Taking the Reading to Gatwick route for example.

At Wokingham if the route towards Gatwick is electrified and the signalling system was used to energise the routes 'live' rail one signalling section ahead of the train service and de-energised behind the service in conjunction with the signalling aspects rear of the train would that work.

Come on all you experts, tell me why it cant be done and thus deny me that knighthood.

All said with tongue in cheek of course.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #1 on: January 08, 2019, 19:27:03 »

I think one problem would be that no one would know whether the rail was live or not. People might become accustomed to it not being live and take even more risks. 
Logged
martyjon
Transport Scholar
Hero Member
******
Posts: 1941


View Profile
« Reply #2 on: January 08, 2019, 19:41:17 »

I think one problem would be that no one would know whether the rail was live or not. People might become accustomed to it not being live and take even more risks. 

More stupid those people then.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #3 on: January 08, 2019, 19:43:20 »

I think one problem would be that no one would know whether the rail was live or not. People might become accustomed to it not being live and take even more risks. 

More stupid those people then.


But a lot off such design issues are about protecting stupid people from themselves. 
Logged
laird
Transport Scholar
Full Member
******
Posts: 78


View Profile
« Reply #4 on: January 08, 2019, 19:59:48 »

You could switch like Crossrail from a signaller to a Traffic Manager they can then hold Signalling and Electrical skills.
But more fundamentally switching is ideally minimised to protect the switching equipment.
In terms of safety until proven and locked off no-one should be working near a bare conductor e.g. third rail so procedurally it wouldn't matter if it was switched on or off after each train.
Logged
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1248



View Profile
« Reply #5 on: January 08, 2019, 20:51:45 »

People might become accustomed to it not being live and take even more risks. 

[TiC] Yes, but they would only be electrocuted before being run-over!  Shocked [/TiC]
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5226


There are some who call me... Tim


View Profile
« Reply #6 on: January 08, 2019, 21:19:11 »


Has it ever been suggested that future third rail electrification schemes be controlled by the signalling system ?


I think the main problem with this suggestion is that it contains the phrase 'future third rail electrification'. Syntactically and grammatically there is nothing wrong with this, but the same could be said of the phrase 'vegetarian butcher's shop'.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #7 on: January 09, 2019, 00:00:42 »

In terms of safety until proven and locked off no-one should be working near a bare conductor e.g. third rail so procedurally it wouldn't matter if it was switched on or off after each train.

Yes so far as working on the line.

But if potential trespassers hear that it is only on when there is a train coming they are more likely to trespass and then get caught out!
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7809



View Profile
« Reply #8 on: January 09, 2019, 05:07:41 »

In terms of safety until proven and locked off no-one should be working near a bare conductor e.g. third rail so procedurally it wouldn't matter if it was switched on or off after each train.

Yes so far as working on the line.

But if potential trespassers hear that it is only on when there is a train coming they are more likely to trespass and then get caught out!

......but only once! 😉
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #9 on: January 09, 2019, 10:19:41 »

I wondered at first what the point of the suggestion was, but I guess it must be an attempt to make the system safe enough to overcome the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about)'s current stance of "over our dead regulatory body". But if so, why the half measures?

For trams, we have the Alstom re-invention of ground pick-up, which seems to have convinced several powers that be of its safety. In that case the tram itself covers the live contact so it's out of reach of reckless humans, and I think a similar shielding arrangement is needed here. So you would need the third rail to be encased in insulation, with electronically switched contacts all along it, and a much longer pick-up "ski" along the train with insulation on top if it too. To meet the gauging constraints this will almost certainly need to be flexible, so as to follow the shape of the third rail without sticking out too far. Since its length determines the spacing of contact points, and the number of those will be a cost driver, you may and up extending this contact bar to the full length of the train (or at least EMU (Electric Multiple Unit)).

Obviously it will all be a bit more expensive, but at least it could largely get rid of the problem of "gapping".
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #10 on: January 09, 2019, 10:34:06 »


Has it ever been suggested that future third rail electrification schemes be controlled by the signalling system ?

Yes and is in used today every day.

The traction current and the return current through Blackfriers station is squentially swithed through the platforms by the signalling track circuits.  This is part of the ad/dc traction power sepertaion.


The main problem in use on a "main line" would be having to energise sections in advance of the train also the conrail in the rear of the train will be live until the train has cleared the section.  There would not be any improvement in the safety of the system.  Inaddition often electrical sections a fed through due to a rectifier being out of use for maintenance or failure.


Technically posible but I doubt there would be much gained otherthan add an addition failure mode
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #11 on: January 09, 2019, 23:45:16 »


So, set the direction control, brakes off, open the power controller, nobble the driver vigilance device and given suitable signal positions, you could do without the driver!

Hmmmm,

OTC

Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5226


There are some who call me... Tim


View Profile
« Reply #12 on: January 31, 2019, 10:28:17 »

...the same could be said of the phrase 'vegetarian butcher's shop'.

The biter bit!

Quote
Unilever buys meat-free food company The Vegetarian Butcher
Acquisition of Dutch brand highlights scramble to tap into meat substitutes market
Unilever is buying the meat-substitute company The Vegetarian Butcher as it looks to cash in on the growing number of consumers turning their backs on meat.

Founded by the former cattle farmer Jaap Korteweg, the Dutch brand’s quirky products – which include “nochicken” nuggets and “chickburgers”, apparently with the same “taste and structure” as patties made out of chicken – have earned it a cult following among vegetarians and vegans.

The Guardian
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page