Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 07:15 02 May 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
2nd May (1859)
Royal Albert Bridge opens

Train RunningCancelled
05:03 Penzance to London Paddington
05:23 Hereford to London Paddington
06:37 Plymouth to London Paddington
07:17 Didcot Parkway to London Paddington
07:33 Weymouth to Gloucester
07:40 Bristol Temple Meads to Westbury
Short Run
04:50 Fratton to Bristol Temple Meads
05:55 Reading to Redhill
05:59 Gatwick Airport to Reading
06:04 Paignton to Exmouth
06:18 Yeovil Pen Mill to Filton Abbey Wood
06:34 Paignton to Exmouth
06:38 Weymouth to Gloucester
06:52 Worcester Foregate Street to Bristol Temple Meads
07:12 Newquay to Par
07:13 Great Malvern to London Paddington
11:10 Gloucester to Weymouth
Delayed
06:00 London Paddington to Penzance
06:43 Worcester Shrub Hill to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 02, 2024, 07:34:11 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[147] Train drivers "overwhelmingly white middle aged men"
[83] Leven, Fife, Scotland, fast forward a month
[49] Visiting the pub on the way home.
[44] underground plans for Bristol update.
[32] Vintage film - how valid are these issues today?
[31] Infrastructure problems in Thames Valley causing disruption el...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4]
  Print  
Author Topic: A new Severn tunnel - or other crossing?  (Read 14364 times)
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #45 on: October 26, 2021, 07:32:34 »

Long tunnels are inherently vulnerable to fire.

And bridges are vulnerable to impact by shipping as in the case of a certain previous Severn railway bridge. 
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1538



View Profile
« Reply #46 on: October 26, 2021, 08:36:49 »

Quote
And bridges are vulnerable to impact by shipping as in the case of a certain previous Severn railway bridge.

....but I doubt that anyone would now propose a bridge consisting of a series of relatively short spans between several towers as in that structure.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5414



View Profile
« Reply #47 on: October 26, 2021, 09:52:13 »

Long tunnels are inherently vulnerable to fire.

And bridges are vulnerable to impact by shipping as in the case of a certain previous Severn railway bridge. 

Yes, but this proposal was for a substantial barrage of stone and concrete that would resist damage from a ship. With lock gates in the middle for ships, and a bridge under which ships could pass.
An out of control ship might damage the lock gates but not the bridge.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
johnneyw
Transport Scholar
Hero Member
******
Posts: 2285


From station to station, back to Bristol city....


View Profile
« Reply #48 on: October 26, 2021, 11:05:50 »

The problem with the Severn Estuary was always the issue of silting up and turning the whole expanse into flood plain.  I'm not sure anyone has come up with a practical, economically viable solution to that.  As for the impact on natural habitats....
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #49 on: October 27, 2021, 15:58:42 »

A causeway would, as pointed out before, be phenomenally expensive. The risks, both economic and environmental, can be modelled, but have a great degree of the unknown about them. The much smaller Rance barrage has caused silting, and seen off a couple of species that previously lived in the estuary. Whether the power it produces swings the balance to positive depends on whether you are talking to an ecologist or a civil engineer, but the effects came as a slight surprise. A Severn Barrage could spring much greater surprises, or it might be perfectly fine, but the uncertainty is probably more than enough to put off private investors.  Government knows that if it promoted the barrage, the battle between green power lovers and nature lovers would go on for years before a decision could be taken, even longer than HS2 (The next High Speed line(s)) or Hinkley C. For these reasons, I doubt it will happen.

The first tunnel seems to have been a mistake that won't be repeated, even if the engineers of the day did get away with it. A new one would, as stated earlier, need a much more sophisticated design of twin bores or escape towers mid-river, and extra Severn bores don't come cheap.

That leaves a bridge as the favourite. I doubt that it could incorporate wind turbines, as they need regular maintenance, and there is a risk of bits dropping off. Not a high risk, but enough to preclude a rail service. I can't see the benefit would justify the cost as things stand, even though the engineering would be much simpler than for a barrage or tunnel.
Logged

Now, please!
eXPassenger
Transport Scholar
Hero Member
******
Posts: 548


View Profile
« Reply #50 on: October 27, 2021, 18:26:35 »

If we were Danish we would have put rail lines on the second Severn crossing (Prince of Wales Bridge).
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page