Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:55 04 May 2024
- 'Shocking' - Women from Wales have to travel to England for abortions
- Will John Swinney change the SNP’s fortunes?
- Women from Wales have to travel to England for abortions
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
4th May (1951)
Festival of Britain opens to public (*)

Train RunningCancelled
13:20 Hereford to London Paddington
20:10 Weston-Super-Mare to Bristol Temple Meads
22:02 London Paddington to Bristol Parkway
23:23 Gatwick Airport to Guildford
05/05/24 00:22 Guildford to Gatwick Airport
Short Run
11:30 Taunton to London Paddington
14:30 London Paddington to Weston-Super-Mare
17:30 London Paddington to Weston-Super-Mare
05/05/24 06:12 Gatwick Airport to Guildford
Delayed
12:03 London Paddington to Penzance
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 04, 2024, 14:03:21 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[215] Learning in Spain, and learning lessons back for the UK
[102] Something different !
[71] Reopening Cullompton and Wellington stations (merged topic)
[66] Walking between stations
[65] Just how big is the gap to mind?
[54] Severn Tunnel emergency closure, 2nd May 2024.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 53 54 [55] 56 57 ... 112
  Print  
Author Topic: Cotswold Line redoubling: 2008 - 2011  (Read 644114 times)
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #810 on: November 06, 2010, 23:16:35 »

Actual physical tokens, carried by the drivers in their cab, will disappear from the Cotswold Line as of August next year. Only the train staff for the Long Marston branch will remain.

I think it's somewhere back up the thread, but the future arrangement will be as follows:

Wolvercot junction to Ascott-under-Wychwood: track circuit block, as now
Ascott to Moreton-in-Marsh: absolute block, as now
Moreton-in-Marsh to Honeybourne: absolute block, with axle counters.
Honeybourne to Evesham: track circuit block
Evesham to Norton junction: token block, but using a direction lever system interlocked at the two signal boxes, so that only one train is permitted on the single-line section at a time and the drivers do not need to collect a lump of metal.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #811 on: November 06, 2010, 23:20:20 »

Evesham to Norton junction: token block, but using a direction lever system interlocked at the two signal boxes, so that only one train is permitted on the single-line section at a time and the drivers do not need to collect a lump of metal.

That sounds rather similar to what they do on the Salisbury to Exeter singled sections, but there it's called 'tokenless block'...  Shocked

Paul
« Last Edit: November 07, 2010, 00:07:04 by paul7755 » Logged
Weston-Sub-Edge
Jr. Member
**
Posts: 13


View Profile
« Reply #812 on: November 06, 2010, 23:29:54 »

So access to Long Marston from the Worcester direction will be controlled from Evesham remotely by way of a colour light and feather/motorised points and from Oxford by a "GPL (Ground Position Light)" for a shunt from down to up to branch? Which box will control the "phantom" Campden Tunnel crossover? Is this a ground frame, GPL or a fictional piece of point work?

Sorry to keep banging on about this subject. There still seems to be some conjecture?

The ^200k p/a maintenance costs, quoted earlier, per set of remote points seems a liitle on the high side from a lay man's perspective. How much does a ground frame cost in comparison (inc the hut and associated paraphanalia)? The basic tarck work is the same surely?
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #813 on: November 06, 2010, 23:49:18 »

Evesham to Norton junction: token block, but using a direction lever system interlocked at the two signal boxes, so that only one train is permitted on the single-line section at a time and the drivers do not need to collect a lump of metal.

That sounds rather similar to what they do on the Salisbury to Exeter singled sections, bit there it's called 'tokenless block'...  Shocked

Paul

Sorry, tokens still lodged in my brain...

Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #814 on: November 07, 2010, 10:30:29 »

So access to Long Marston from the Worcester direction will be controlled from Evesham remotely by way of a colour light and feather/motorised points and from Oxford by a "GPL (Ground Position Light)" for a shunt from down to up to branch? Which box will control the "phantom" Campden Tunnel crossover? Is this a ground frame, GPL or a fictional piece of point work?

Sorry to keep banging on about this subject. There still seems to be some conjecture?



As I said, Honeybourne's main line signals and points will be an all-electric installation worked by Evesham, so yes, logically, it should have a feather for the sidings/branch for trains from Evesham as it would be a diverging line. As for a crossover at Campden, it's never been mentioned anywhere else than that one article and I can't see what possible purpose one would serve there anyway. Only thing I'm aware of in the Chipping Campden area, other than new track and a new level crossing is that they will make passive provision for platforms for a new station, one either side of the level crossing, though this now looks a very distant prospect, as it doesn't even get a vague mention in the new Gloucestershire Local Transport Plan.
Logged
Adrian the Rock
Full Member
***
Posts: 38



View Profile WWW Email
« Reply #815 on: November 07, 2010, 13:29:03 »

...I think it's somewhere back up the thread, but the future arrangement will be as follows:

Wolvercot junction to Ascott-under-Wychwood: track circuit block, as now
Ascott to Moreton-in-Marsh: absolute block, as now
Moreton-in-Marsh to Honeybourne: absolute block, with axle counters...

Axle counters are only needed in the Down direction.  On the Up, the signaller at Moreton-in-Marsh can observe the tail lamp of arriving trains to give Train Out of Section in the normal way.  (This is obviously not possible for the Evesham signaller when Down trains reach Honeybourne, hence the need for axle counters.)

Quote
...Honeybourne to Evesham: track circuit block...

Yes, though perhaps more analogous to Intermediate Block (IB) sections.

Quote
...Evesham to Norton junction: token block, but using a direction lever system interlocked at the two signal boxes, so that only one train is permitted on the single-line section at a time and the drivers do not need to collect a lump of metal.

That sounds rather similar to what they do on the Salisbury to Exeter singled sections, but there it's called 'tokenless block'...  Shocked

This will not be the Salsibury-Exeter (and Ledbury-Shelwick Jn) tokenless block system.  It is TCB (Track Circuit Block) with an acceptance lever at Norton Jn.  Similar to the Ascott-Wolvercot and Droitwich-Stoke Works Jn sections except that axle counters will be used instead of actual track circuits.

Quote from: willc
...As I said, Honeybourne's main line signals and points will be an all-electric installation worked by Evesham, so yes, logically, it should have a feather for the sidings/branch for trains from Evesham as it would be a diverging line.

If my memory serves, the signal leading from the Up Cotswolds to the Long Marston branch will also be a position-light aspect ('cats eyes') rather than a feather, as the branch is not a passenger class line.
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #816 on: November 07, 2010, 15:14:05 »

No wonder they wanted to renew the lot and move signalling control to Didcot. You can only wonder if this will prove any cheaper, especially if it only lasts six years or so.

New Charlbury footbridge story here http://www.oxfordmail.co.uk/news/8620928.Charlbury_rail_station_revamp_agreed/
Logged
Adrian the Rock
Full Member
***
Posts: 38



View Profile WWW Email
« Reply #817 on: November 07, 2010, 18:56:36 »

No wonder they wanted to renew the lot and move signalling control to Didcot. You can only wonder if this will prove any cheaper, especially if it only lasts six years or so...

The main savings would be in only having to make selective changes to Moreton-in-Marsh and Ascott-under-Wychwood, rather than resignalling those completely.

Controlling it all from Didcot would undoubtedly have reduced the running costs, but that's academic if you can't afford the capital expenditure involved in achieving it.

Where did the six years come from?
Logged
Moreton134
Full Member
***
Posts: 30


View Profile
« Reply #818 on: November 07, 2010, 22:36:58 »

I've heard in six years time Network rail plan to install ERTMS (European Rail Traffic Management System.) (currently being trialled on the Cambrian route) to the western region, so I guess that would make signals obsolete.

On a slightly different topic but does anybody know if DB» (Deutsche Bahn - German State Railway - about) Schenker or Freightliner plan to utilise the upgraded route for the occasional or diverted through Freight?
Logged
Weston-Sub-Edge
Jr. Member
**
Posts: 13


View Profile
« Reply #819 on: November 08, 2010, 00:49:58 »

Thanks Aidrian re: Honeybourne signalling specification. I had no idea a branch had to carry pax before a feather could be warranted. I'm not a fan of cats eyes signals as they are so hard to see and easily vandalised. But i'm sure they are cheaper than a full upright colour light.
Will there be any intermediate signals between Evesham and Moreton other than those protecting the crossings at Littleton and Blockley?
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #820 on: November 08, 2010, 00:57:05 »

Quote
Where did the six years come from?

Oxford area resignalling falls due early in the next Network Rail control period (2014-19). Worcester is also due for renewal in CP5 (Control Period 5 - the five year period between 2014 and 2019) (there may be more on their thinking on Worcester in the new West Midlands and Chilterns RUS (Route Utilisation Strategy), due out in draft consultation form some time this month). They're not going to leave 50 miles of rag-tag signalling in between the two areas, whatever technology is chosen to re-equip them and the intention is still to move control to Didcot at some point, Oxford resignalling being the obvious moment. It was only with deep reluctance that they dropped full resignalling and moving to Didcot this time round. Having visited the signalling centre and seen it in action, I can understand why they wanted to make the switch. Light years away from lever frames, bells and semaphores.

On the freight side, Network Rail are keen to see more freight trains on the line, though in the short term that is likely to be increased movements in and out of Long Marston, which are effectively capped today by the limited paths available. Motorail, who operate Long Marston, are certainly keen to exploit the site's potential.

There may be the odd freight diversion but the line's loading gauge is W6, so not container train-friendly as things stand.

DB» (Deutsche Bahn - German State Railway - about) Schenker and EWS (English Welsh & Scottish Railway Ltd, now known as DB Schenker Rail (UK (United Kingdom))) before them have made noises about creating a freight depot in the Vale of Evesham, presumably with an eye on the amount of fruit and veg moving in and out of the area by road (especially, I imagine, the imports from the Continent for onward distribution) but nothing concrete has come of it yet.

If it was to come to fruition (sorry!) then I would have thought they might have their eye on the former Honeybourne airfield, adjacent to the old Stratford-Cheltenham line, which is nice and flat with room available and with longstanding use as business parks, with a couple of food distributors based there already. This site was suggested as a possibility in a recent letter to Modern Railways. And, of course, the bridge over the bit of line you would need to reopen to reach the site from Honeybourne station has just been renewed for the redoubling. Main problem with this site is the poor roads around it, though the same could be said for many routes used now by the local hauliers to get to and from their depots.
Logged
stebbo
Hero Member
*****
Posts: 445


View Profile
« Reply #821 on: November 08, 2010, 13:40:25 »

To reach Honeybourne airfield you'd need to sort out the old level crossing just beyond the curent sidings and remove the building that's helpfully been built on the old through lines. Not saying it couldn't - or indeed shouldn't - be done. Then opens up the line back to Stratford, which I would guess could become important again.

But why did BR (British Rail(ways)) let people build on trackbeds? Same problem at Cheltenham where there's a car repairer on the trackbed of the old GWR (Great Western Railway) line just before the former junction with the current track, down the bottom of the station car park.
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #822 on: November 08, 2010, 15:23:01 »

But why did BR (British Rail(ways)) let people build on trackbeds? Same problem at Cheltenham where there's a car repairer on the trackbed of the old GWR (Great Western Railway) line just before the former junction with the current track, down the bottom of the station car park.

I agree with you about building on old railway land, but it probably depends on who owns the land.

If the plot has been sold off and the new owner has built onit then you will need  compulsary purchase order (or modern equivalent) to recover it. If the land is still in railway ownership then the occupier will have a lease which hopefully has a break clause requiring him to give it up when required.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10125


View Profile
« Reply #823 on: November 08, 2010, 16:49:51 »

Since Tuesday, rails have been dropped either side of Blockley level crossing and on to Chipping Campden, also at Honeybourne and at least as far west as Clayfield level crossing. There did seem to be a bit of gap east of Honeybourne, but as there is no public access near the line most of the way towards Mickleton I don't know how far it goes.

There's rail been dropped on all of the route set to be re-doubled now apart from Ascott eastwards for 1.75miles and from Evesham as far as Clayfield L/C.  There are small gaps elsewhere, but to compensate there is extra rail a few metres further along - sometimes equipment in the 4 foot gets in the way.  There are overnight possessions booked for this Wednesday and Thursday specifically to drop more rail off in the Evesham to Clayfield gap.

Also, there are now three separate gangs working on the cable troughing.  Two in the Evesham-Moreton section and the other in the Ascott-Charlbury section, so I expect they could manage a couple of miles a week between them which should see the job more or less done by the time the rails start being laid in earnest.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
IndustryInsider
Moderator
Hero Member
*****
Posts: 10125


View Profile
« Reply #824 on: November 08, 2010, 16:53:46 »

Thanks Aidrian re: Honeybourne signalling specification. I had no idea a branch had to carry pax before a feather could be warranted.

You can have signals onto freight routes with the feathers or with ground position lights/cats eyes (just depends on the location, frequency of use, whether it's permissive working and so on), but you can't have passenger trains just going on GP signals without an associated main signal under normal running.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 53 54 [55] 56 57 ... 112
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page