Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 13:35 02 May 2024
* New weather warning after thunderstorms hit UK
- Russia blamed for GPS interference affecting flights in Europe
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
2nd May (1859)
Wilton South station opened

Train RunningCancelled
13:00 Bristol Temple Meads to London Paddington
Short Run
10:55 Paignton to London Paddington
12:35 London Paddington to Exeter St Davids
13:18 Hereford to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 02, 2024, 13:37:59 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[275] Vintage film - how valid are these issues today?
[81] Leven, Fife, Scotland, fast forward a month
[74] Train drivers "overwhelmingly white middle aged men"
[59] Visiting the pub on the way home.
[22] underground plans for Bristol update.
[15] Infrastructure problems in Thames Valley causing disruption el...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 16 17 [18] 19 20 21
  Print  
Author Topic: Extending Crossrail to Reading - ongoing discussion, merged topic  (Read 158556 times)
Adelante_CCT
Transport Scholar
Hero Member
******
Posts: 1314



View Profile
« Reply #255 on: November 03, 2015, 12:49:38 »

At the risk of stating the obvious, it would be good to see the proposed service pattern at least for the east end of GWR (Great Western Railway), with stopping patterns, line usage, frequencies, stock type, train lengths etc.  When will this be available?

If I remember correctly in one of the recent pdf publications (possibly a network rail or GWR one, I can't remember, it was mentioned on this forum about 2 months ago) they talked about having created a 2019 draft timetable, I think it was called 'Timetable 5' or 'Version 5' something along those lines, whether anyone has access to this?.... Unfortunately more than likely anyone that does have access wouldn't be allowed to re-publish
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #256 on: November 03, 2015, 14:28:03 »

Doesn't the Western route study define a 2019 service pattern?   Might have to be distilled from a number of different sections, but it includes a number of tables showing peak services by train type and capacity, and any number of line drawings showing all the different routes.

Paul
Logged
Adelante_CCT
Transport Scholar
Hero Member
******
Posts: 1314



View Profile
« Reply #257 on: November 03, 2015, 18:04:52 »

Quote
If I remember correctly in one of the recent pdf publications (possibly a network rail or GWR (Great Western Railway) one, I can't remember, it was mentioned on this forum about 2 months ago) they talked about having created a 2019 draft timetable, I think it was called 'Timetable 5' or 'Version 5' something along those lines, whether anyone has access to this?.... Unfortunately more than likely anyone that does have access wouldn't be allowed to re-publish
From Augusts WRS (Western Route Study - Network Rail's successor to the RUS):
Quote
A proposed development timetable has been constructed for 2019 (known as ^Iteration 5^) which is based on a number of assumptions for the deployment and operation of the new SETs (Super Express Train (now IET)), EMUs (Electric Multiple Unit), Crossrail and freight.


Quote
At the risk of stating the obvious, it would be good to see the proposed service pattern at least for the east end of GWR, with stopping patterns, line usage, frequencies, stock type, train lengths etc.  When will this be available?
Quote
Doesn't the Western route study define a 2019 service pattern?   Might have to be distilled from a number of different sections, but it includes a number of tables showing peak services by train type and capacity, and any number of line drawings showing all the different routes.

Yes and no, it does show proposed tph between origin and destination, but no explanation about what stops these will call at.
Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #258 on: November 03, 2015, 18:07:59 »

Doesn't the Western route study define a 2019 service pattern?   Might have to be distilled from a number of different sections, but it includes a number of tables showing peak services by train type and capacity, and any number of line drawings showing all the different routes.

Paul

Paul, thank you.  I'd forgotten that this document contained such detailed info.  I've just been looking at Section G: Reading-Didcot-Oxford, and must admit to being somewhat taken aback by how many more trains they're planning to run, including more freight paths and East-West services from/to Reading.  I'd love to see a draft timetable for Reading - Oxford.

Just relevant to the topic I hope, as what happens east of Reading affects stopping services west of Reading.

 
Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #259 on: November 04, 2015, 08:12:50 »

... and to go back to where we started with this, ie platform capacity at Reading, it may not be possible to construct the timetable for Crossrail, GWR (Great Western Railway) Reading ^ Oxford stoppers, East-West services etc in a way which minimises RL platform requirements at Reading.  There will be many other factors involved.

I still think RL platform capacity at Reading will be tight when the new services planned between now and 2019 start up.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #260 on: November 04, 2015, 18:35:30 »

... and to go back to where we started with this, ie platform capacity at Reading, it may not be possible to construct the timetable for Crossrail, GWR (Great Western Railway) Reading ^ Oxford stoppers, East-West services etc in a way which minimises RL platform requirements at Reading.  There will be many other factors involved.

I still think RL platform capacity at Reading will be tight when the new services planned between now and 2019 start up.


The Reading Oxford stoppers could be replaced by EastWest Rail services, the Crossrail services I suspect will be on a fairly quick turn round at Reading I wonder if it will be one out and one in the same platform worse case the occupation of two platforms will not be for extended periods of time
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Adelante_CCT
Transport Scholar
Hero Member
******
Posts: 1314



View Profile
« Reply #261 on: November 04, 2015, 21:19:21 »

... and to go back to where we started with this, ie platform capacity at Reading, it may not be possible to construct the timetable for Crossrail, GWR (Great Western Railway) Reading – Oxford stoppers, East-West services etc in a way which minimises RL platform requirements at Reading.  There will be many other factors involved.
I still think RL platform capacity at Reading will be tight when the new services planned between now and 2019 start up.

The Reading Oxford stoppers could be replaced by EastWest Rail services, the Crossrail services I suspect will be on a fairly quick turn round at Reading I wonder if it will be one out and one in the same platform worse case the occupation of two platforms will not be for extended periods of time

Below is an extract from the Route Study
Quote
The 2019 ITSS anticipates that two trains per hour running from Bedford/Milton Keynes to Oxford will be extended to Reading in place of the existing stopping service over this section of route, picking up intermediate station calls. This timetable solution is driven by the limited capacity available over the two-track section from 2019 between Oxford and Didcot and at Didcot East Junction

This would suggest that the intermediate stops will be taken over by the east-west trains, therefore meaning stations between Radley and Tilehurst (Didcot excepted) would lose their direct services into London, it would also require a change at Reading for smaller journeys such as to Twyford or Maidenhead. Then again further back in the same document:
Quote
Considering market potential highlights the following possible
linkages:
^ London to Oxford (stopping service). An existing service pattern
which links significant origins and destinations west and east of
Reading

This would suggest that they plan on taking out a direct (eg: Tilehurst to Twyford)  service from 2019, however they realise that this may be an incorrect decision, and are already figuring how to re-instate this direct service after it has been removed... Crazy!

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #262 on: November 04, 2015, 23:02:05 »

This would suggest that they plan on taking out a direct (eg: Tilehurst to Twyford)  service from 2019, however they realise that this may be an incorrect decision, and are already figuring how to re-instate this direct service after it has been removed... Crazy!

Well, the loss of the through stopping trains is due to Crossrail on the east side, and lack of capacity on the west side. The Route Study is inconsistent as to what any "residual" GWR (Great Western Railway) service on the Crossrail route would do in 2019 or in 2043, but explicit that East-West Rail can't be added to other services, so it takes over the stops.

The "2043 ITSS" includes extra services that need new infrastructure, such as the Didcot East grade separation and/or 4-tracking to Oxford. Whether any new cross-Reading stopping service could go all the way through to Paddington is very questionable, as is the need. Capacity closer to London is tight already, and none of the infrastructure options looks convincing. In any case, how far would you choose to go on an all-station stopping service? Most of the other through-Reading options discussed only make sense if they are reasonably fast, as joining them up makes them even longer-distance services.

Should we be thinking more in terms of a genuine Reading suburban service? (Think "Crossreading".)
« Last Edit: February 11, 2016, 23:18:45 by stuving » Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12367


View Profile Email
« Reply #263 on: November 05, 2015, 09:51:12 »

In the long run, I can't see the franchisee of EastWest wanting local stops from East Anglia to Reading (or Heathrow Western access?)....it'd be like stopping XC (Cross Country Trains (franchise)) at those stations....
Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #264 on: November 05, 2015, 11:03:24 »

I agree.  If you^re on a Reading to Milton Keynes service you don^t want to be stopping at every plank of wood.  And for Tilehurst/Pangbourne etc passengers a through service to Maidenhead and London is much more useful than one to Milton Keynes, which is why it looks far better to link the Rdg ^ Oxford stoppers with the GWR (Great Western Railway) semi-fasts to London and not with East-West.

Which leaves the Rdg ^ Oxford route capacity problem in 2019 unresolved.

Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12367


View Profile Email
« Reply #265 on: November 05, 2015, 11:08:08 »

I can't see EastWest running beyond Oxford by that date....may not even be running at all, depending on the NR» (Network Rail - home page) review report coming at the end of the month!
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #266 on: November 05, 2015, 20:46:45 »

I can't see EastWest running beyond Oxford by that date....may not even be running at all, depending on the NR» (Network Rail - home page) review report coming at the end of the month!

EWrail is funded by the Local Authority collaboration, NR are the delivery vehicle and infrastructure operator, any proposed changes to NR will only me NR's bit gets handed to whichever German /  Dutch / French / Spanish / Chinese / Russian etc chunks of our railway get given too
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #267 on: December 16, 2015, 12:32:52 »

Latest Crossrail construction video updates here: https://player.vimeo.com/video/148478024 and here: https://www.youtube.com/watch?v=65ok77gPdXo&feature=youtu.be
« Last Edit: December 16, 2015, 12:45:01 by SandTEngineer » Logged
Andrew1939 from West Oxon
Hero Member
*****
Posts: 535


View Profile Email
« Reply #268 on: December 16, 2015, 16:47:33 »

Several senior GWR (Great Western Railway) staff have talked in the past about starting some of the Reading/Gatwick trains back from Oxford after the Reading underpass had been made useable. Perhaps this could explain the mention of more Oxford/Reading trains?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #269 on: December 16, 2015, 16:55:26 »

Several senior GWR (Great Western Railway) staff have talked in the past about starting some of the Reading/Gatwick trains back from Oxford after the Reading underpass had been made useable.

Problem for me is that through trains across Reading to/from Gatwick don't fit the electrification strategy, or the rolling stock cascade strategy.   It would be a bit of an own goal to introduce them and then remove them just a couple of years later.

I suspect such proposals in the past might have predated the electrification decision - there was of course a period when Reading remodelling was all go but wires were not...

Paul
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 16 17 [18] 19 20 21
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page