Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:35 06 May 2024
- Starliner: Nasa to fly new craft to space station
- Train strikes: How May's disruption affects you
- Families' station safety plea as third woman hit
- Eurotunnel says no queues with new travel system
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (1994)
Channel Tunnel opened (link)

Train RunningCancelled
07:10 Penzance to London Paddington
08:35 Plymouth to London Paddington
10:41 Cardiff Central to London Paddington
11:32 London Paddington to Cheltenham Spa
11:50 Cardiff Central to London Paddington
11:52 London Paddington to Hereford
12:10 Weston-Super-Mare to Severn Beach
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:18 Hereford to London Paddington
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:16 Westbury to Swindon
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:30 Swindon to Westbury
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
08:15 Penzance to London Paddington
09:59 Cardiff Central to Taunton
10:46 Avonmouth to Weston-Super-Mare
10:52 Plymouth to Cardiff Central
10:59 Cardiff Central to Penzance
11:10 Gloucester to Weymouth
12:30 Cardiff Central to Portsmouth Harbour
13:11 Taunton to Cardiff Central
13:15 London Paddington to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:23 Portsmouth Harbour to Cardiff Central
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Delayed
05:40 Penzance to Cardiff Central
11:13 London Paddington to Didcot Parkway
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 11:46:47 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[182] Okehampton-Tavistock. Discussion on reopening and potential us...
[130] Server load - 5th May 2024
[60] New station at Ashley Down, Bristol
[56] How to provide capacity and increase service to hourly each wa...
[52] Champion to Westbury
[49] CrossCountry upgrade will see 25% more rail seats
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 58 59 [60] 61 62 ... 176
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 1059495 times)
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #885 on: March 10, 2014, 08:26:06 »

Isn't that somewhat later than originally billed. This is the headline on Network Rail's GW (Great Western) Electrification page.

We^re electrifying the railway between London and Bristol, including Newbury and Oxford, by 2016 and to Cardiff by 2017
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #886 on: March 10, 2014, 09:35:11 »

Isn't that somewhat later than originally billed. This is the headline on Network Rail's GW (Great Western) Electrification page.

We^re electrifying the railway between London and Bristol, including Newbury and Oxford, by 2016 and to Cardiff by 2017

Well, yes, they do still say the line is to be ready by 2016, but the first trains (IEP (Intercity Express Program / Project.)) are not due until 2017. So it may be a matter of months for Parkway - but it does look as if the order has been changed, with most Bristol services being delayed.

Now would that be because there is going to be other work in or around Temple Meads at the time?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #887 on: March 10, 2014, 09:51:39 »

... but the first trains (IEP (Intercity Express Program / Project.)) are not due until 2017.
Having quoted that from a press release, some NR» (Network Rail - home page) publicity still says "into use from 2016".
Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #888 on: March 10, 2014, 13:35:29 »

Wide-ranging article on the National Electrification Programme - http://www.therailengineer.com/2014/03/07/national-electrification-programme/
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
bobm
Administrator
Hero Member
*****
Posts: 9851



View Profile
« Reply #889 on: March 15, 2014, 14:28:02 »

Swindon is the High Output Operating Base, or HOOB. From my research (I'm not a professional railwayman but I'm usually pretty good with Google) I believe it will look something like this:



Seems you weren't alone with this thought...  the signallers at Swindon beat you to it.  Saw this at Swindon Panel where they control access to the depot which holds the train.

« Last Edit: March 15, 2014, 14:50:00 by bobm » Logged
JayMac
Data Manager
Hero Member
******
Posts: 18930



View Profile
« Reply #890 on: March 15, 2014, 14:45:31 »

Brilliant! Made me chuckle.  Grin
Logged

"Build a man a fire and he'll be warm for the rest of the day. Set a man on fire and he'll be warm for the rest of his life."

- Sir Terry Pratchett.
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #891 on: March 17, 2014, 17:46:30 »

^87 million GWML (Great Western Main Line) electrification substations contract awarded - http://www.globalrailnews.com/2014/03/17/great-western-electrification-contract-awarded/
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 17905


I am not railway staff


View Profile Email
« Reply #892 on: March 17, 2014, 20:41:33 »

A variation on the story (with a possibly more relevant picture to illustrate it), from the BBC» (British Broadcasting Corporation - home page):

Quote
London Paddington to Bristol rail electrification creates Swindon jobs


Electric trains should be running between London and Bristol by 2016

About 100 jobs will be created in Swindon as part of the electrification of the railway line between London Paddington and Bristol.

Network Rail bosses are due to sign the deal with ABB and UK (United Kingdom) Power Networks Services to provide 30 electricity substations to power the trains.

The first of the stations is due to be delivered in June 2015 with the remainder at six-week intervals

Work to upgrade bridges along the route is already under way.

The route between London and Bristol - including the Newbury to Oxford link - is due to be completed by 2016 with the extension to Cardiff by 2017.

A Network Rail spokesman said electric trains would have 20% more seats than a diesel equivalent, with journey times improved.
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #893 on: March 18, 2014, 08:26:50 »

Disagreement between UK (United Kingdom) government and WAG» (Welsh Assembly Government - about) over who should pay for Valley Lines Electrification - http://www.bbc.co.uk/news/uk-wales-26620650
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #894 on: March 18, 2014, 17:18:24 »

Disagreement between UK (United Kingdom) government and WAG» (Welsh Assembly Government - about) over who should pay for Valley Lines Electrification - http://www.bbc.co.uk/news/uk-wales-26620650

Well, there's a shock.
Logged

Now, please!
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #895 on: March 21, 2014, 14:29:30 »

Disagreement between UK (United Kingdom) government and WAG» (Welsh Assembly Government - about) over who should pay for Valley Lines Electrification - http://www.bbc.co.uk/news/uk-wales-26620650

And more -
http://www.bbc.co.uk/news/uk-wales-26676140
Logged
DidcotPunter
Sr. Member
****
Posts: 166


View Profile Email
« Reply #896 on: March 21, 2014, 17:01:54 »

I think it's been mentioned before but the extension of electrification from Newbury to Bedwyn now appears to be receiving positive consideration by DfT» (Department for Transport - about)

http://www.railtechnologymagazine.com/Rail-News/electrification-of-great-western-beyond-newbury-being-considered

Not a done deal yet though - and given the costs involved of the other options to extend the wires to Westbury and beyond, anything further than Bedwyn seems unlikely at this stage.
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #897 on: March 21, 2014, 17:18:33 »


Well, yes, they do still say the line is to be ready by 2016, but the first trains (IEP (Intercity Express Program / Project.)) are not due until 2017. So it may be a matter of months for Parkway - but it does look as if the order has been changed, with most Bristol services being delayed.

Now would that be because there is going to be other work in or around Temple Meads at the time?

Here in Four Track, Now! Towers, we have been pondering the same point. The IEP programme will add traffic to the line between BRI» (Bristol Temple Meads - next trains) and Filton, with two extra TPH (trains per hour) each way from BRI to PAD» (Paddington (London) - next trains) via BPW» (Bristol Parkway - next trains) being only the start. Trains will need to get to and from the depot as well. The MetroWest plans could move ahead at some pace, but even the status quo will be tricky to maintain with only two tracks. The slightest problem brings everything  grinding to a halt.
Logged

Now, please!
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #898 on: March 24, 2014, 08:29:36 »

^87 million GWML (Great Western Main Line) electrification substations contract awarded - http://www.globalrailnews.com/2014/03/17/great-western-electrification-contract-awarded/

Further detail on the substations contract - http://www.breakingtravelnews.com/news/article/abb-and-consortium-partner-win-145-million-order-to-upgrade-uk-rail-network/
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Electric train
Transport Scholar
Hero Member
******
Posts: 4364


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #899 on: March 24, 2014, 20:15:24 »


SMOS light  Roll Eyes bit of an oxymoron, it much heavier than the SMOS used at Hayes and Old Oak Common Feeder Stations when HEX was commissioned in the 1990's ............. its called progress.  Tongue

To be fair though this concept requires less site work to install and commission basically out door switchgear on a pallet on a mast ............. as an electrical engineer I think it will look fantastic  Grin
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 58 59 [60] 61 62 ... 176
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page