Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 10:15 06 May 2024
- Starliner: Nasa to fly new craft to space station
- Train strikes: How May's disruption affects you
- Families' station safety plea as third woman hit
- Eurotunnel says no queues with new travel system
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (1994)
Channel Tunnel opened (link)

Train RunningCancelled
07:10 Penzance to London Paddington
08:35 Plymouth to London Paddington
09:18 London Paddington to Cardiff Central
11:32 London Paddington to Cheltenham Spa
11:50 Cardiff Central to London Paddington
11:52 London Paddington to Hereford
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:18 Hereford to London Paddington
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:16 Westbury to Swindon
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:30 Swindon to Westbury
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
07:33 Weymouth to Gloucester
08:15 Penzance to London Paddington
08:19 Taunton to Cardiff Central
08:23 Southampton Central to Bristol Temple Meads
09:59 Cardiff Central to Taunton
10:41 Cardiff Central to London Paddington
11:10 Gloucester to Weymouth
12:10 Weston-Super-Mare to Severn Beach
13:11 Taunton to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Delayed
05:40 Penzance to Cardiff Central
07:03 London Paddington to Paignton
08:32 London Paddington to Cheltenham Spa
10:59 Cheltenham Spa to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 10:30:11 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[219] Okehampton-Tavistock. Discussion on reopening and potential us...
[157] Server load - 5th May 2024
[72] New station at Ashley Down, Bristol
[62] Champion to Westbury
[32] OTD - 6 May 1994 Euro Tunnel official opening
[23] Problems with the Night Riviera sleeper - December 2014 onward...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 38 39 [40] 41 42 43
  Print  
Author Topic: Chiltern Evergreen 3 project - ongoing discussion  (Read 353414 times)
Noggin
Hero Member
*****
Posts: 519


View Profile
« Reply #585 on: November 10, 2016, 12:25:13 »

Would these be the same neighbours who bought new flats backing onto railway sidings only, to complain when they realised that they weren't empty at night, but full of DMUs (Diesel Multiple Unit) with diesel engines running by any chance?

Reminds me of the acquaintance at university who was renowned as a light sleeper, who proudly announced the location of his new house, right next to the railway line in Cardiff. When questioned on the wisdom of this, his reply was that the only trains using the line were squitty little things that stopped running reasonably early. Didn't have the heart to tell him about the coal trains with squealing brakes that used the line through the night, I believe he was on sleeping pills within a couple of weeks and moved out before the end of the first term. 
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #586 on: November 10, 2016, 13:32:45 »

Would these be the same neighbours who bought new flats backing onto railway sidings only, to complain when they realised that they weren't empty at night, but full of DMUs (Diesel Multiple Unit) with diesel engines running by any chance?

No, these are townhouses much nearer the station where the new platforms are being built.


How much of the falling behind has been due to delays in starting while NR» (Network Rail - home page) responded to objections by the same neighbours, eventually found by the planning process to be unjustified?  

"Own goal" is the first phrase that springs to mind.

For the one person with influence (and any others) that tried to put all sorts of spanners in the works, I agree.  I feel sorry for those that have just shrugged their shoulders and put up with it and are now faced with a month of constant noise, and NR certainly won't be endearing themselves to them one bit.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #587 on: November 20, 2016, 10:21:28 »

I think it's going to be called 'Up Relief' from Wolvercote Junction to Oxford North Junction, then 'Up Jericho Bi-Di' or something very similar from Oxford North Junction to Oxford station.  Either way, I'll confirm when I know for sure.

I know for sure - from NR» (Network Rail - home page)'s Project Senior Sponsor....which is where my info came from initially, but now have it in writing

Quote
Following the commissioning of Phase 1, in 2018, it will be call the “UP Relief” all the way from Wolvercote Junction to Oxford station.

That should defuse any arguments!

I suspect he's a reader on here :-)


Well that's very strange because on the Signalling Scheme Plans its called the 'Up Oxford Relief' and it extends all the way from Wolvercote Junction to Hinksey North (in the final layout).

Wow, Chris B looks as if he might be in the wrong. Is this a first ?

I strongly doubt it this time :-)

Well, all I can state is that on the Phase 0 and Phase 1 final TVSC» (Thames Valley Signalling Centre - about) signalling scheme plans that I have seen its always shown as 'Up Oxford Relief'.  Currently, as Industry Insider has stated above, it is called the 'Down Jericho'.

Finally seen it confirmed in enough official places to confirm it is going to be called the 'Up Oxford Relief'.  SandTEngineer was right.  ChrisB, his contact within NR, and my original suggestion were wrong.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #588 on: November 21, 2016, 12:31:45 »

According to the Open Train Times maps test running/driver training has commenced today (21 November 2016) between Oxford Parkway and Oxford.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #589 on: November 21, 2016, 12:42:47 »

Hmmm, interesting - must just be to the 3car platform 2 plus the other movs within the station - platform 1 & the extension to platform 2 aren't finished yet....

I wonder who trains the driver trainers? :-)
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #590 on: November 21, 2016, 12:58:10 »

Hmmm, interesting - must just be to the 3car platform 2 plus the other movs within the station - platform 1 & the extension to platform 2 aren't finished yet....

I wonder who trains the driver trainers? :-)

Yes, really interesting as I have just watched a test train (5T22) go into and out of Oxford Platform No.1. Roll Eyes Cheesy

They are also testing movements to/from the Oxford Up Carriage Sidings and Hinksey Reception Line.
« Last Edit: November 21, 2016, 13:30:48 by SandTEngineer » Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #591 on: November 21, 2016, 13:30:16 »

Progress over the weekend - there was little track in that platform 1 last Friday.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #592 on: November 23, 2016, 18:30:56 »

Geoff Plumb has added three pics to his site of a Chiltern unit on the section near Wolvercot tunnel:
https://plumbloco.smugmug.com/Trains/November-2016/i-4Tdd8kQ

Paul

Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #593 on: November 23, 2016, 19:53:42 »

With signalling commissioned the footpath at Aristotle Lane has finally closed.  Much upset to allotment owners who now have to take a slight detour over a new bridge.

However a major improvement for lots of local residents as whistle boards associated with the crossing have now been removed.  They might not notice too much difference in the short term though, as workers still need to be warned of approaching trains as they finish off the Oxford Corridor Phase 0 works and continue Phase 1 works recently started.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Noggin
Hero Member
*****
Posts: 519


View Profile
« Reply #594 on: November 23, 2016, 22:14:38 »

Geoff Plumb has added three pics to his site of a Chiltern unit on the section near Wolvercot tunnel:
https://plumbloco.smugmug.com/Trains/November-2016/i-4Tdd8kQ

Paul


Wow, that's a lot of yellow fencing. Presumably what H&S (Health and Safety) demands these days when you have rebuilds.

Incidentally, does anyone know if the support for future electrification goes as far as mast bases installed, or are there just gaps where they can be planted as required?
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #595 on: November 23, 2016, 22:42:33 »

Just passive provision.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Noggin
Hero Member
*****
Posts: 519


View Profile
« Reply #596 on: November 24, 2016, 13:45:51 »

Just passive provision.

Ta
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #597 on: December 03, 2016, 17:10:41 »

The full length of Platform 2 (six cars) at Oxford is being commissioned this weekend, with Platform 1 set to follow on the day of the new service starting.  Still a fair bit of work to do on it and I imagine it will still be a bit of a mess for a few months after whilst several bits of work are completed - the canopy for a start.  Not the sort of impression Chiltern would have wanted to present to its passengers, but I guess getting it open on time is the important thing!
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #598 on: December 03, 2016, 17:36:56 »

There apears to be a height difference between platforms 2&3, with a ramp construction at the north end with a step currently closer to the overbridge. Wasn't expecting that...
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #599 on: December 08, 2016, 20:44:57 »

Reminds me of the acquaintance at university who was renowned as a light sleeper.

I knew a light sleeper who always woke up with a light on.

I can't finish that joke...
Logged

Now, please!
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 38 39 [40] 41 42 43
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page