Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 07:35 06 May 2024
- Eurotunnel says no queues with new travel system
- Train strikes: How May's disruption affects you
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (1994)
Channel Tunnel opened

Train RunningCancelled
05:55 Plymouth to London Paddington
06:48 Cheltenham Spa to London Paddington
07:03 Bristol Temple Meads to Taunton
08:35 Plymouth to London Paddington
09:18 London Paddington to Cardiff Central
11:32 London Paddington to Cheltenham Spa
11:50 Cardiff Central to London Paddington
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
05:11 Gloucester to Southampton Central
07:10 Penzance to London Paddington
07:33 Weymouth to Gloucester
08:15 Penzance to London Paddington
08:19 Taunton to Cardiff Central
08:23 Southampton Central to Bristol Temple Meads
09:59 Cardiff Central to Taunton
11:10 Gloucester to Weymouth
11:52 London Paddington to Hereford
12:10 Weston-Super-Mare to Severn Beach
13:11 Taunton to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:18 Hereford to London Paddington
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Delayed
05:40 Penzance to Cardiff Central
07:03 London Paddington to Paignton
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 07:36:53 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[143] New station at Ashley Down, Bristol
[125] Server load - 5th May 2024
[46] Problems with the Night Riviera sleeper - December 2014 onward...
[45] Walking between stations
[43] Something different !
[41] Champion to Westbury
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 52 53 [54] 55 56 ... 78
  Print  
Author Topic: Intercity Express Programme (IEP) - ongoing discussion  (Read 748984 times)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #795 on: August 08, 2016, 15:50:10 »

I would presume 5 car.

Certainly some confusion out there.  Ollie's been told 9-car, the article Adelante_CCT linked to says 9-car, ChrisB, TrainSpy and Rob T on here say 9-car.  However several posters on the wnxx forum are confident of 5-car including Mark Hopwood apparently confirming that to staff yesterday. 

Looks like the wnxx forum have conceded they are probably wrong, so looking like they'll be 9-car sets.  Excellent news.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 12368


View Profile Email
« Reply #796 on: August 31, 2016, 13:29:16 »

I think we'd worked this out already.....from RAIL

Quote
GWR (Great Western Railway) electrification uncertainty raises timetable issues

The ability of Great Western Railway’s Class 800 bi-mode electric multiple units to meet current and future timetables is under scrutiny by the train operator, due to their maximum speed in diesel mode of 100mph.Network Rail’s electrification of the Great Western Main Line is taking place on a discontinuous basis, and the trains will have to run on diesel power between energised sections at potentially lower maximum speeds than the current High Speed Trains, which can operate at up to 125mph.However, uncertainty about exactly which sections will go live (and when) means that planning future timetables when the fleet begins entering service from next year is proving extremely difficult. The Class 802s have a design speed of 125mph under electric traction.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5416



View Profile
« Reply #797 on: August 31, 2016, 19:49:32 »

If these additional sets are to be 9 car as now seems probable, then that is indeed good news.

I still have considerable reservations regarding the downgrading from a buffet to a trolley, the reduced first class, and the limited number of tables, but 9 cars is better than 5.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #798 on: September 05, 2016, 11:49:04 »

I think we'd worked this out already.....from RAIL

Quote
GWR (Great Western Railway) electrification uncertainty raises timetable issues

The ability of Great Western Railway’s Class 800 bi-mode electric multiple units to meet current and future timetables is under scrutiny by the train operator, due to their maximum speed in diesel mode of 100mph.Network Rail’s electrification of the Great Western Main Line is taking place on a discontinuous basis, and the trains will have to run on diesel power between energised sections at potentially lower maximum speeds than the current High Speed Trains, which can operate at up to 125mph.However, uncertainty about exactly which sections will go live (and when) means that planning future timetables when the fleet begins entering service from next year is proving extremely difficult. The Class 802s have a design speed of 125mph under electric traction.

Acceleration / deceleration will also be an issue under diesel power, presumably.
Logged

Now, please!
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #799 on: September 05, 2016, 14:06:06 »

We discussed the issue of journey time being extended when IEP (Intercity Express Program / Project.) bi-modes take over from HST (High Speed Train)’s back at the end of April, in the Across the West – GWML (Great Western Main Line) Electrification thread, following my tongue-in-cheek suggested PR (Public Relations) line of “here are your new trains, it’s now 10 minutes longer to London”.

An exaggeration of course, and we agreed certainly not applicable to N Cotswold services, but in the early days it may not be far off the truth for S Wales services if IEP’s are used before the wires go live to Bristol Parkway. 
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5416



View Profile
« Reply #800 on: September 05, 2016, 21:52:47 »

Acceleration would indeed be slower under diesel power, but surely Deceleration would be the same under diesel or electric ? The brakes should work just the same and would not "know" what power source has accelerated the train.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #801 on: September 05, 2016, 23:39:17 »

Acceleration would indeed be slower under diesel power, but surely Deceleration would be the same under diesel or electric ? The brakes should work just the same and would not "know" what power source has accelerated the train.

Not necessarily as I would assume that the IEP (Intercity Express Program / Project.) would have regenerative braking under the wires. Can you have that under diesel power?
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #802 on: September 05, 2016, 23:53:50 »

Acceleration would indeed be slower under diesel power, but surely Deceleration would be the same under diesel or electric ? The brakes should work just the same and would not "know" what power source has accelerated the train.

Not necessarily as I would assume that the IEP (Intercity Express Program / Project.) would have regenerative braking under the wires. Can you have that under diesel power?

If you are still running with traction motors you could still have rheostatic braking - where the current generated goes into a resistor (rheostat). Don't know if IEP's do that
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #803 on: September 06, 2016, 09:32:55 »



If you are still running with traction motors you could still have rheostatic braking - where the current generated goes into a resistor (rheostat). Don't know if IEP (Intercity Express Program / Project.)'s do that

let's hope not.  Isn't it the roof mounted rheostats that short out on Voyagers when sprayed with sea water at Dawlish?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #804 on: September 06, 2016, 11:41:27 »

AIUI (as I understand it) from magazine articles all IEPs (Intercity Express Program / Project.) will have some resistive braking capability, but the 802s will have higher rated resistance banks as they will be used more on that class.

Paul
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #805 on: September 06, 2016, 15:53:35 »

but the 802s will have higher rated resistance banks as they will be used more on that class.

Paul

Please tell me that they will not be on the roof or otherwise in the way of salt spray!
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #806 on: September 06, 2016, 16:26:15 »

I doubt there's anywhere else they could be - as they need air cooling.

Paul
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #807 on: September 06, 2016, 16:53:41 »

I doubt there's anywhere else they could be - as they need air cooling.

Paul

So do people, in the summer, and they are allowed inside.

I think the ballast resistance may be quite small, and primarily needed to make the bidirectional inverter work properly, and indeed work without going pop if it momentarily isn't connected to a 25 kV supply.
« Last Edit: September 21, 2016, 12:18:59 by stuving » Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #808 on: September 21, 2016, 10:43:07 »

So deceleration may indeed be a slight issue...
Logged

Now, please!
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #809 on: September 21, 2016, 11:25:53 »

I doubt there's anywhere else they could be - as they need air cooling.

Paul

I agree,  There isn't anywhere else obvious to put them.  I predict that there will be problems at high tide. 
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 52 53 [54] 55 56 ... 78
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page