From
Network RailA level crossing in Tackley, Oxfordshire, has closed and been replaced by footbridge as Network Rail continues to make the railway safer.
The crossing, near to Tackley station, was closed today (28 April) and has been replaced by a footbridge.
It follows repeated misuse of the level crossing with 15 incidents reported in the last 18 months.
The footbridge is a temporary structure as Network Rail continues to develop plans to create a subway which would also be wheelchair accessible. It is expected these plans will be shared with the community later this year.
Passengers and walkers will be able to use the new footbridge to access platform two, or to walk the bridleway to the east of the village.
And from
National RailThe level crossing at Tackley station has been closed. The Oxford bound platform is only accessible via a stepped footbridge. Passengers who require step free access to that platform, please call the Passenger Assist team on 0800 197 1329.
And from
Real Time Trains looking for all services calling today
No trains found
Sorry, no trains were found with your search criteria.
You can try changing them in the menu to the left to reduce the search constraints.