Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:55 05 May 2024
* Thousands run Belfast roads as marathon under way
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
5th May (1973)
Blue Pullman farewell tour (*)

Train RunningCancelled
14:44 London Paddington to Great Malvern
22:45 Bristol Temple Meads to Cardiff Central
Short Run
07:51 London Paddington to Penzance
09:18 Cardiff Central to Portsmouth Harbour
10:58 Weymouth to Swindon
11:44 London Paddington to Hereford
11:46 Swindon to Weymouth
11:49 Penzance to Cardiff Central
12:25 Cardiff Central to Portsmouth Harbour
12:44 London Paddington to Hereford
13:08 Portsmouth Harbour to Cardiff Central
17:30 Hereford to London Paddington
18:00 Cardiff Central to Taunton
19:40 Worcester Foregate Street to Bristol Temple Meads
Delayed
09:29 Bristol Temple Meads to Weymouth
An additional train service has been planned to operate as shown 11:44 London Paddington to Reading
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 05, 2024, 12:10:03 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[127] Learning in Spain, and learning lessons back for the UK
[106] Champion to Westbury
[93] Something different !
[67] 2024 - Service update and amendment log, Swindon <-> Westbury...
[65] Walking between stations
[50] Just how big is the gap to mind?
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 97 98 [99] 100 101 ... 176
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 1059110 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1470 on: December 02, 2015, 19:56:43 »

I've noticed they've got wires up at the Stoke Gifford depot, just seem to be single wires, not the full catenary.

Depots use what is called a "trolley wire" system it is just a single wire usually fixed tension.  The trolley wire is used in depots because of the low speeds in depots; it is simpler system and requires less maintenance than catenary system
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TonyK
Global Moderator
Hero Member
*****
Posts: 6439


The artist formerly known as Four Track, Now!


View Profile
« Reply #1471 on: December 02, 2015, 23:01:30 »

As the trains are supposed to enter under diesel power, the reduced standard seems acceptable.
Logged

Now, please!
DidcotPunter
Sr. Member
****
Posts: 166


View Profile Email
« Reply #1472 on: December 03, 2015, 08:10:59 »

I thought they were supposed to use electric power at Stoke Gifford? Anyway the trolley wire OLE (Overhead Line Equipment, more often "OHLE") is also installed at the Reading Depot and is pretty standard at electrified depots elsewhere where speeds are low and a simpler system will suffice.
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1473 on: December 03, 2015, 09:32:14 »

Are electric trains in depots ever able to move under electric power supplied from a plugged in cable (ie with the pan down)?  or would such a system be too low power to work?
Logged
grahame
Administrator
Hero Member
*****
Posts: 40869



View Profile WWW Email
« Reply #1474 on: December 03, 2015, 11:02:36 »

Are electric trains in depots ever able to move under electric power supplied from a plugged in cable

Errrrrrrr ... isn't that a bit difficult?   As the train moves away from the socket, it pulls the plug out, and to move any great distance there are going to need to be some very long cables.    As a layman, it sounds reasonable for turning wheels to get another bit to the top for attention, but not for relocating trains.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #1475 on: December 03, 2015, 11:16:38 »

Are electric trains in depots ever able to move under electric power supplied from a plugged in cable

Errrrrrrr ... isn't that a bit difficult?   As the train moves away from the socket, it pulls the plug out, and to move any great distance there are going to need to be some very long cables.    As a layman, it sounds reasonable for turning wheels to get another bit to the top for attention, but not for relocating trains.

DC (Direct Current) third rail, and LU fourth rail, systems do not normally extend through shed maintenance roads, at the speeds the trains enter they run until nearly 'off the end' of the external DC and then get plugged into a shore traction power system that is fed by cables from trolleys at roof level, that trolley can then move with the train.  But the trains only need to move the last few yards using this power, and on leaving they only have to move until the first shoe is in contact with the normal third rail outside the shed. On most current DC units the main risk to personnel is that the pick up shoes are always live throughout the train when ever there is traction power on, the shoes have fuses but are not individually switched.

You cannot safely provide 25kV down a portable plug and socket system though, so I think in AC sheds the solution is just to run in and then isolate the OHLE prior to roof access, using key access systems.  Sometimes the depot power is supplied through a conductor bar system that can be moved out of the way to give better roof access.

Paul
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #1476 on: December 03, 2015, 11:19:17 »

Errrrrrrr ... isn't that a bit difficult?   As the train moves away from the socket, it pulls the plug out, and to move any great distance there are going to need to be some very long cables. 

Well, it can be done if you put your mind to it. Not long ago, when this country had an iron ore industry, there was a huge Ransomes and Rapier electric walking dragline (called "Sundew" - the biggest in the world in its day) that was powered via a long cable from a fixed substation. I came across it as an example on a management course - it was more memorable than the rest of the course. The project we looked at was its famous cross-country walk in 1974 to get 13 miles to a new quarry near Corby.

Anyway, I can't find its power rating just now, but its cable (11 kV?) needed a Scammel tractor to drag it around the quarry, or across the fields, following the dragline.
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5416



View Profile
« Reply #1477 on: December 03, 2015, 11:23:15 »

Are electric trains in depots ever able to move under electric power supplied from a plugged in cable (ie with the pan down)?  or would such a system be too low power to work?

I do not see why it could not be done, but AFAIK (as far as I know) it never is these days. The length of cable would be limited by cost and weight, it would be a trip hazard if at floor level, and the risk of mishap if driving beyond the limit of cable length.
If a standard industrial supply was used, say 400 volts 3 phase, then a converter on the train would be needed thereby adding weight and complexity.

IIRC (if I recall/remember/read correctly) a plug in trailing cable WAS used in the distant past to power DC (Direct Current) EMUs (Electric Multiple Unit) in depots, but not these days. I think that the voltage was a then fairly standard 250 volts DC, sufficient to power 750 volt DC traction equipment at much reduced power.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1478 on: December 03, 2015, 18:17:32 »

Are electric trains in depots ever able to move under electric power supplied from a plugged in cable

Errrrrrrr ... isn't that a bit difficult?   As the train moves away from the socket, it pulls the plug out, and to move any great distance there are going to need to be some very long cables.    As a layman, it sounds reasonable for turning wheels to get another bit to the top for attention, but not for relocating trains.

All third rail traction maintenance sheds have a 750V dc trolley wire system (note this is different to the 25kV discussed above) with a cable with a plug that goes into the unit, the unit is then able to creep out of the shed, it is not normally required to enter the shed.  The trolley wire can also be used to power the unit to aid fault finding.  Once the unit is sufficiently out of the shed and the shoes are on the con rail the plug can be removed. For long units 8s and 12s two trolley wire cable are plugged in.  The trolley wire has contactor which has an inter-lock key that is part of the depot safety system (de-railers and signals etc)

Modern dc traction maintenance sheds have the running rails earthed to the depots main earth terminal this is to ensure there is no greater than 25V touch potential; the normal main line dc the running rails are earth free (they are earthy but not directly connected to the general mass of the earth) this means all modern sheds need their own dedicated rectifiers dc switchgear and a switched buffer zone on the shed approach road.

For 25kV maintenance sheds most if not all roads are wired at 25kV.  There is a dedicated switch for each road which isolates the 25kV and applies an earth to the OLE (Overhead Line Equipment, more often "OHLE") on that road, the OLE switch has an inter-lock key that is part of the depot safety system (de-railers and signals etc) releases gates to access platforms, overhead hoists etc

Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Cruithne3753
Full Member
***
Posts: 51



View Profile
« Reply #1479 on: December 06, 2015, 00:59:29 »

I've noticed they've got wires up at the Stoke Gifford depot, just seem to be single wires, not the full catenary.

Depots use what is called a "trolley wire" system it is just a single wire usually fixed tension.  The trolley wire is used in depots because of the low speeds in depots; it is simpler system and requires less maintenance than catenary system

From where I am (I work at the NHS blood centre just to the West of the new depot) it looks like it's on the curve just South of Patchway... part of the main line?
Logged

Matt
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1480 on: December 06, 2015, 07:50:22 »

I've noticed they've got wires up at the Stoke Gifford depot, just seem to be single wires, not the full catenary.

Depots use what is called a "trolley wire" system it is just a single wire usually fixed tension.  The trolley wire is used in depots because of the low speeds in depots; it is simpler system and requires less maintenance than catenary system

From where I am (I work at the NHS blood centre just to the West of the new depot) it looks like it's on the curve just South of Patchway... part of the main line?

Depots have things called head shunts these will often run parallel to the main running lines, it could also be one of the depot reception roads both these are low speed so can use simple OLE (Overhead Line Equipment, more often "OHLE") system such as a trolley wire
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1481 on: December 07, 2015, 10:05:19 »

Wow.  Thanks for everyone's input.  Rather typical of this forum, ask a simple question and learn more than you imagined.

Thanks
Logged
grahame
Administrator
Hero Member
*****
Posts: 40869



View Profile WWW Email
« Reply #1482 on: December 08, 2015, 02:46:45 »

http://www.networkrailmediacentre.co.uk/news/residents-invited-to-drop-in-event-to-find-out-more-about-electrification-of-the-great-western-main-line-through-pilning?

Quote
Residents invited to drop-in event to find out more about electrification of the Great Western Main Line through Pilning

Pilning residents are invited to attend a drop-in event to find out more about the work taking place in their area to prepare the Great Western Main Line for the arrival of a new fleet of electric trains.

The event will take place between 3.30pm and 6.30pm on Thursday, December 17 at the Mafeking Hall, Redwick Road, Pilning. Members of the Network Rail project team will be on hand throughout to explain the plans and to answer any questions.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
rower40
Transport Scholar
Sr. Member
******
Posts: 292

Turning signalling into a video game since 1988.


View Profile
« Reply #1483 on: December 08, 2015, 10:40:43 »

Does this mean there'll be piling in Pilning?

(Will they be using Tubular steel in Oldfield Park?)
Logged
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1484 on: December 08, 2015, 12:32:56 »

 Grin  Cheesy Curiously enough, someone was talking about you, Rower, when one Ursus maritimus stopped us all near a railway bridge somewhere in the Greater West Midlands Conurbation.


As for Pilning, it's ironic that a place with two trains a weeks gets an electrification event, but it's just the sort of place that would have a Mafeking Hall. Goes with the Indian Orthodox Church! In a way...
Logged

Waiting at Pilning for the midnight sleeper to Prague.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 97 98 [99] 100 101 ... 176
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page