Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 11:15 04 May 2024
- 'Shocking' - Women from Wales have to travel to England for abortions
- Will John Swinney change the SNP’s fortunes?
- Women from Wales have to travel to England for abortions
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
4th May (2017)
First WECA Mayor elected (*)

Train RunningCancelled
13:20 Hereford to London Paddington
20:10 Weston-Super-Mare to Bristol Temple Meads
22:02 London Paddington to Bristol Parkway
05/05/24 00:22 Guildford to Gatwick Airport
Short Run
08:50 Great Malvern to London Paddington
09:50 London Paddington to Hereford
10:24 Bristol Parkway to London Paddington
17:30 London Paddington to Weston-Super-Mare
05/05/24 06:12 Gatwick Airport to Guildford
Delayed
09:58 Great Malvern to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 04, 2024, 11:16:09 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[184] Learning in Spain, and learning lessons back for the UK
[103] Reopening Cullompton and Wellington stations (merged topic)
[94] Just how big is the gap to mind?
[79] Severn Tunnel emergency closure, 2nd May 2024.
[33] June to December 2024 Timetables
[32] Walking between stations
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 159 160 [161] 162 163 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1369195 times)
ironstone11
Full Member
***
Posts: 75


View Profile
« Reply #2400 on: November 20, 2013, 17:26:10 »

This gantry arrangement has appeared to the East of Reading - close to the Southern underpass. Is it OLE (Overhead Line Equipment, more often "OHLE")? No-one expects that to be pretty, but this is decidedly clunky.
Also visible from Camera 02/2. Almost certainly OLE.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #2401 on: November 20, 2013, 17:30:39 »

From 00:01 Saturday another part of Platform 8 is opened, in addition to the area currently open, meaning that HST (High Speed Train)'s will once again be able to stop with all doors opening as the useable length will then be 220 metres.  The remaining 64 metres at the Bristol end of the platform will then reopen at a later date.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #2402 on: November 20, 2013, 17:42:57 »

From 00:01 Saturday another part of Platform 8 is opened, in addition to the area currently open, meaning that HST (High Speed Train)'s will once again be able to stop with all doors opening as the useable length will then be 220 metres.  The remaining 64 metres at the Bristol end of the platform will then reopen at a later date.

When I checked a couple of days ago Realtimetrains had the P8/9 island being generally used the other way around from Monday, i.e. with most HST operated services at P8 and most XC (Cross Country Trains (franchise)) reversals in P9.   So that suggests they'll now renew the P9 face 50% at a time?

Am I right in thinking that some of the 64 metres that you mention includes the section alongside the points which cannot be built yet, in other words the 220 metres from the east end will be most of the length as far as the WH Smiths, with a few coping slabs missing (as before) on the remaining few metres to allow for gauge clearance as trains head over to the down main?

Paul
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10125


View Profile
« Reply #2403 on: November 20, 2013, 17:50:23 »

That's right I think, Paul - regarding the 'missing' length of Platform 8.  No mention of Platform 9 in the notice I saw, but I suspect that'll be the case as well sooner or later.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
DidcotPunter
Sr. Member
****
Posts: 166


View Profile Email
« Reply #2404 on: November 20, 2013, 20:21:45 »

This gantry arrangement has appeared to the East of Reading - close to the Southern underpass. Is it OLE (Overhead Line Equipment, more often "OHLE")? No-one expects that to be pretty, but this is decidedly clunky.
Also visible from Camera 02/2. Almost certainly OLE.

Definitely OLE.  I suspect that the rather substantial portal structure is for the termination of wire runs of which there would be several to the east of the station.
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #2405 on: November 21, 2013, 14:18:14 »

From 00:01 Saturday another part of Platform 8 is opened, in addition to the area currently open, meaning that HST (High Speed Train)'s will once again be able to stop with all doors opening as the useable length will then be 220 metres.  The remaining 64 metres at the Bristol end of the platform will then reopen at a later date.

That is some good going. When I last looked it was largely complete except for the section under the transfer deck where the exposed platform edge was all metal. I was guessing that section is over the subway.
The platform buildings on P8/P9 were starting to see some glazing earlier in the week.

P10/P11 has most but not all of the canopy in place and the floor was being concreted in sections the other evening. There was a cement mixer running outside the south entrance around 18:00, maybe related ?
This morning I noticed there are sleepers in place at the London end where the P10 track branches off but little else.

P7 is quite the building site, the platform wall, edging slabs and tamped backfill is in place all the way from the eastern edge to west of the transfer deck. The rest of it is a bit of a mess with major excavations for steelwork foundations.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4363


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #2406 on: November 21, 2013, 19:54:24 »

This gantry arrangement has appeared to the East of Reading - close to the Southern underpass. Is it OLE (Overhead Line Equipment, more often "OHLE")? No-one expects that to be pretty, but this is decidedly clunky.
Also visible from Camera 02/2. Almost certainly OLE.

Definitely OLE.  I suspect that the rather substantial portal structure is for the termination of wire runs of which there would be several to the east of the station.

Definitely an OLE "Goal Post" structure as DP said it is terminating wire, lower cross bar for the contact wire the upper for the catenary wire, usually found at terminating platform ends or stop block ends of sidings.

OLE structures and foundations are all in the main from a standard range called OLEMI (Overhead Line Equipment Master Index) which is "Railway Industry open source" this save time and cost of each foundation and structure having to be individually calculated and designed instead the NR» (Network Rail - home page) Project Engineer can approve the selection for the foundation and structure based on the known Geotech and OLE loadings
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #2407 on: November 21, 2013, 21:36:04 »

Quite a bit of progress out west on the central viaduct sections today, looks like around ten or more girders have been craned in over the course of the day, there's no longer a big gap half way along anyway...   

As seen on Webcam 06/02.

Paul
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #2408 on: November 21, 2013, 22:37:45 »

Also on camera 06/2 today, there was concrete pump "giraffe" in the background - presumably at the feeder lines box.
Logged
bobm
Administrator
Hero Member
*****
Posts: 9846



View Profile
« Reply #2409 on: November 22, 2013, 00:24:15 »

I hesitate to ask, but what is a concrete pump "giraffe"?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #2410 on: November 22, 2013, 07:25:23 »

I hesitate to ask, but what is a concrete pump "giraffe"?
One of them.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #2411 on: November 22, 2013, 07:57:28 »

Quite a bit of progress out west on the central viaduct sections today, looks like around ten or more girders have been craned in over the course of the day, there's no longer a big gap half way along anyway...   

As seen on Webcam 06/02.

Paul

... and today, the end span closest to camera 06/2 is being done.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #2412 on: November 23, 2013, 19:35:09 »

... and today, the end span closest to camera 06/2 is being done.

Another set of beams appears to have been delivered today, but I can only assume they are parked up for the day and are to go somewhere at the east end which is currently out of sight of the webcam, as there is no longer anywhere obvious to put them in the foreground, at least that I can see.

Paul
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #2413 on: November 24, 2013, 08:16:19 »

Another set of beams appears to have been delivered today, but I can only assume they are parked up for the day and are to go somewhere at the east end which is currently out of sight of the webcam, as there is no longer anywhere obvious to put them in the foreground, at least that I can see.

As I suspected they were installed somewhere over night. Must have been near to a road.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #2414 on: November 24, 2013, 11:59:09 »

Another set of beams appears to have been delivered today, but I can only assume they are parked up for the day and are to go somewhere at the east end which is currently out of sight of the webcam, as there is no longer anywhere obvious to put them in the foreground, at least that I can see.

As I suspected they were installed somewhere over night. Must have been near to a road.

In fact, they went at the far end of the run of spans - just visible on camera. But why that had to be done overnight ...
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 159 160 [161] 162 163 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page