Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 08:35 06 May 2024
- Starliner: Nasa to fly new craft to space station
- Eurotunnel says no queues with new travel system
- Train strikes: How May's disruption affects you
* Families' station safety plea as third woman hit
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (1968)
Trains between Exeter and Plymouth via Okehampton withdrawn

Train RunningCancelled
05:55 Plymouth to London Paddington
06:48 Cheltenham Spa to London Paddington
07:10 Penzance to London Paddington
08:35 Plymouth to London Paddington
09:18 London Paddington to Cardiff Central
11:32 London Paddington to Cheltenham Spa
11:50 Cardiff Central to London Paddington
11:52 London Paddington to Hereford
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:18 Hereford to London Paddington
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
07:33 Weymouth to Gloucester
08:15 Penzance to London Paddington
08:19 Taunton to Cardiff Central
08:23 Southampton Central to Bristol Temple Meads
09:59 Cardiff Central to Taunton
11:10 Gloucester to Weymouth
12:10 Weston-Super-Mare to Severn Beach
13:11 Taunton to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Delayed
05:40 Penzance to Cardiff Central
07:03 London Paddington to Paignton
08:34 London Paddington to Didcot Parkway
10:11 Didcot Parkway to London Paddington
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 08:48:34 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[119] New station at Ashley Down, Bristol
[104] Server load - 5th May 2024
[56] Okehampton-Tavistock. Discussion on reopening and potential us...
[53] OTD - 6 May 1994 Euro Tunnel official opening
[38] Problems with the Night Riviera sleeper - December 2014 onward...
[37] Walking between stations
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: So you want public transport timetables changed?  (Read 961 times)
grahame
Administrator
Hero Member
*****
Posts: 40875



View Profile WWW Email
« on: September 02, 2020, 12:45:36 »

There is a lot of information in there and a lot of work undertaken to draw it in from a number of sources.  A useful reference particularly if you are in Melksham but some of the topics also have a wider appeal.

Thank you Bob - quoting from "there" below for more general information.

So you want public transport timetables changed?  

Firstly you have to convince everyone it's a good idea, that it's a free from risk as possible, that no-one is going to loose out, that it's sustainable, that it works through pinch points, that it fits with future strategies, and that it costs next to nothing. And, yes, I mean everyone

Secondly you have to convince people to put the time and effort into planning the changes and taking ownership of them and a pride in them and see them through.  Lots of good ideas are lost in the wilderness of "not invented here" and the jungle of "no-one gets fired for maintaining the status quo" before looking for a way to cross the "Ooz gonna pay4 it" river.

And when you have acheived both of those, thirdly, you have to negotiate the changes through the industry's systems

From (page 4) of the MRUG» (Melksham Rail User Group - site) Newsletter for September 2020 ... from the public, they should know - well - a month or two ahead

Quote
Notice period for changes

The rail industry has been required to give 12 weeks notice of timetable changes and changes for planned engineering in recent years. Sometimes it's failed to do so and only notified changes 6 to 8 weeks ahead. Recently, those notice periods have not been applied and at time the timetable for the one week has only been published during the previous week, with weekend schedules just a few days out.

The bus industry requires up to 72 days notice of timetable changes (though they are often made public only at 28 or 42 days). Once again, changes are happening on a far shorter timescale than "required" at present, but we have been moving to knowing a little further ahead than just a few days.

There is further data about how that is planned within the rail industry ((here)) on the Network Rail web site, showing that in practise the changes are supposed to be in the pipleline nearly a year and a half ahead.

Quote
Network Rail is responsible for coordinating and validating timetables for the national rail network. Each train and freight operating company develops the timetable they would like to run in their area, and Network Rail then coordinates all the different timetables to produce a single national rail timetable.

We update the timetable for the national rail network twice a year, once in May, once in December. This allows train and freight operating companies a regular opportunity to make changes to their services – run more or new services, change the timing of their services, and/or change their routes.

The national timetable needs to balance what can be many competing demands – the heavily used commuter services, slower stopping trains serving small communities, non‐stop fast trains running between major cities, as well as the requirements of businesses that rely on freight.

We have to manage the available space on the rail network so that it is used fairly and safely.

Developing the timetable is a very complex process that seeks to balance
the needs and ambitions of all operators. We have to consult many different organisations as we develop a new national timetable, and it takes 16 months.

How a timetable is developed

16 months in advance
Network Rail establishes what long‐term engineering work will need to take place as part of its ongoing Railway Upgrade Plan during the period of the new timetable.

14 months in advance
Train and freight operating companies give Network Rail advance notice of any significant changes they wish to make to their current timetable.

10 months in advance
Train and freight operating companies formally submit (‘bid’) their new timetable. For the next three months, Network Rail works on developing the new national timetable from all these bids, checking for conflicts between different operators, and ensuring that trains can be run safely.

6 months in advance
Network Rail provides the rail industry with a national ‘base’ timetable, enabling operators to start planning logistics, produce rotas and train staff.

4 months in advance
Operators can ‘bid’ for readjustments to their new timetable to take into account such things as known special events or weekend engineering work. Network Rail again works through the bids for each and every week to ensure there are no conflicts and trains can be run safely.

3 months in advance
The new timetable for each week is finalised and the railway industry formally publishes the timetable to passengers. Advance tickets go on sale.

Day of timetable change
The new timetable comes into operation.

During the period the timetable is operating
Network Rail works very closely with operators to accommodate changes to the timetable, such as increasing services ahead of a sporting event, allowing for emergency engineering works to take place, or manage severe weather.

It can be done ... but you need to have elements of madness to try.  I would not disagree that at times I have elements of madness.
Logged

Coffee Shop Admin, Acting Chair of Melksham Rail User Group, Option 24/7 Melksham Rep
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page