Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 09:35 06 May 2024
- Starliner: Nasa to fly new craft to space station
- Eurotunnel says no queues with new travel system
- Train strikes: How May's disruption affects you
- Families' station safety plea as third woman hit
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 18/05/24 - BRTA Westbury
22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber

On this day
6th May (1968)
Trains between Exeter and Plymouth via Okehampton withdrawn

Train RunningCancelled
07:10 Penzance to London Paddington
08:35 Plymouth to London Paddington
09:18 London Paddington to Cardiff Central
11:32 London Paddington to Cheltenham Spa
11:50 Cardiff Central to London Paddington
11:52 London Paddington to Hereford
12:35 London Paddington to Exeter St Davids
13:50 London Paddington to Great Malvern
13:59 Cheltenham Spa to London Paddington
14:01 Severn Beach to Bristol Temple Meads
14:19 Westbury to Swindon
15:04 Bristol Temple Meads to Filton Abbey Wood
15:14 Swindon to Westbury
15:18 Hereford to London Paddington
15:42 Exeter St Davids to London Paddington
15:51 Filton Abbey Wood to Bristol Temple Meads
16:32 Great Malvern to London Paddington
19:33 London Paddington to Worcester Shrub Hill
19:47 Bristol Temple Meads to Frome
20:58 Frome to Westbury
21:28 Weymouth to Westbury
21:33 Westbury to Salisbury
21:35 Maidenhead to Marlow
22:02 Marlow to Maidenhead
22:28 London Paddington to Bristol Temple Meads
22:35 Maidenhead to Marlow
23:03 Marlow to Maidenhead
23:33 Reading to Gatwick Airport
23:50 Maidenhead to Marlow
07/05/24 00:17 Marlow to Maidenhead
07/05/24 04:45 Redhill to Gatwick Airport
07/05/24 05:11 Gatwick Airport to Reading
Short Run
07:33 Weymouth to Gloucester
08:15 Penzance to London Paddington
08:19 Taunton to Cardiff Central
08:23 Southampton Central to Bristol Temple Meads
08:32 London Paddington to Cheltenham Spa
09:59 Cardiff Central to Taunton
10:59 Cheltenham Spa to London Paddington
11:10 Gloucester to Weymouth
12:10 Weston-Super-Mare to Severn Beach
13:11 Taunton to Cardiff Central
13:32 London Paddington to Cheltenham Spa
15:38 Bristol Temple Meads to Worcester Shrub Hill
15:59 Cheltenham Spa to London Paddington
16:58 London Paddington to Great Malvern
17:10 Gloucester to Weymouth
17:38 Bristol Temple Meads to Worcester Foregate Street
17:50 Gloucester to Salisbury
17:50 Penzance to London Paddington
17:55 Worcester Shrub Hill to Bristol Temple Meads
18:29 Warminster to Bristol Temple Meads
18:53 Worcester Foregate Street to Bristol Temple Meads
19:45 Great Malvern to London Paddington
19:50 Worcester Foregate Street to Bristol Temple Meads
20:06 Westbury to Cheltenham Spa
20:11 Salisbury to Bristol Temple Meads
21:00 Bristol Temple Meads to Worcester Shrub Hill
21:31 London Paddington to Cheltenham Spa
21:53 London Paddington to Worcester Shrub Hill
22:11 Salisbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
Delayed
05:40 Penzance to Cardiff Central
07:03 London Paddington to Paignton
08:34 London Paddington to Didcot Parkway
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
May 06, 2024, 09:37:41 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[178] Server load - 5th May 2024
[124] Okehampton-Tavistock. Discussion on reopening and potential us...
[82] New station at Ashley Down, Bristol
[70] Champion to Westbury
[36] OTD - 6 May 1994 Euro Tunnel official opening
[26] Problems with the Night Riviera sleeper - December 2014 onward...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: After the timetable change - what next? (Qn.2 5/11/2019)  (Read 6163 times)
Red Squirrel
Administrator
Hero Member
*****
Posts: 5226


There are some who call me... Tim


View Profile
« on: November 05, 2019, 17:07:34 »

We wish GWR (Great Western Railway) well in their major timetable change in December, but almost inevitably little snags may arise in the practical experience of running the new schedules. Other longer term changes are being touted / suggested too. For example, there was a question about running later trains, more frequent services on the Severn Beach line, and a report on joining up and improving services from Southampton to Swindon and from Yeovil to Bristol.

What plans do you have in place to deal with immediate issues that arise, further tuning in May 2020, and for the next operating contract phase ("DA3") which is scheduled to run from next year to 2022 or 2024?
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
MarkHopwood
Full Member
***
Posts: 80


View Profile
« Reply #1 on: November 05, 2019, 17:09:20 »

We are fully confident that the timetable will work well in December.  We have a robust contingency plan in place to deal with any issues that may arise.

We are anticipating and planning for a short term dip in performance as customers and colleagues adjust to the new timetable.  This is only natural given the scale of the changes.

May 2020 will see some further limited improvements, and these are still to be confirmed.

DA3 discussions are ongoing for future timetables beyond May 2020 and we look forward to being able to announce proposed future improvements when we have finished negotiations with the DfT» (Department for Transport - about).
Logged
didcotdean
Transport Scholar
Hero Member
******
Posts: 1425


View Profile
« Reply #2 on: November 05, 2019, 17:26:52 »

I note that some of the long-advertised service patterns for the new timetable will not actually be brought into operation in December, and in some respects represent a backward step. An example I am thinking about is the loss of a direct regular interval service from Didcot weekdays to South Wales which seemed to happen late in the process; I am sure that there are more that affect others here. Is any effort available to achieve these expected patterns in future timetables?
Logged
MarkHopwood
Full Member
***
Posts: 80


View Profile
« Reply #3 on: November 05, 2019, 17:35:51 »

You are right that the loss of direct Didcot to South Wales services was a relatively late decision but it has had wider industry support as it was part of a plan which helps creates two freight paths an hour between Didcot and Swindon.

Perhaps more importantly the revenue flows between Bristol/Bath and Didcot (Oxford) are much greater than South Wales and your summary omitted to mention that we are going to a half hourly service at Didcot Parkway all day on that route.

It is our hope the half hourly fast Bristol trains will operate from May 2020.
Logged
didcotdean
Transport Scholar
Hero Member
******
Posts: 1425


View Profile
« Reply #4 on: November 05, 2019, 17:52:14 »

I guess I can take that reply as a 'no' then Smiley

Although I haven't seen it stated before the specific change I mentioned had been at least driven in part by revenue considerations rather than a hitherto unforeseen operational limitation & I welcome the candour on this.
Logged
MarkHopwood
Full Member
***
Posts: 80


View Profile
« Reply #5 on: November 05, 2019, 17:58:12 »

Indeed but since revenue is driven by passengers it also reflects the fact we have chosen to stop the trains at Didcot which will benefit the greatest number of passengers and where the size of potential passengers is greatest.

Ultimately, a timetable is a compromise and sometimes we take decisions with the most overall benefit but I know better than anyone we can’t please everyone all the time.

The role of freight trains brings another dimension to the discussion and Network Rail has an obligation to ensure our timetable is developed on a way that still ensures there is capacity for freight.

On balance I think we have the best answer in the circumstances but I recognise the issue with Didcot to South Wales.
Logged
Celestial
Transport Scholar
Hero Member
******
Posts: 674


View Profile
« Reply #6 on: November 05, 2019, 18:45:35 »

I wonder how much of the revenue attributed to Didcot is "real", and how much is due to splitting tickets. Just a thought!
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page