Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 15:15 30 Apr 2024
- BBC on board Philippine ship hit by Chinese water cannon
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
30th Apr (1972)
Brighton Belle withdrawn (link)

Train RunningCancelled
13:23 Swansea to London Paddington
14:00 London Paddington to Bristol Temple Meads
14:54 Cardiff Central to London Paddington
15:15 Plymouth to London Paddington
15:26 Basingstoke to Reading
15:42 Exeter St Davids to London Paddington
16:00 Oxford to London Paddington
16:30 Bristol Temple Meads to London Paddington
Short Run
12:03 London Paddington to Penzance
13:18 Hereford to London Paddington
14:36 London Paddington to Paignton
15:05 London Paddington to Newbury
15:18 Hereford to London Paddington
15:52 Newbury to London Paddington
Delayed
12:48 London Paddington to Swansea
13:03 London Paddington to Plymouth
14:03 London Paddington to Penzance
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 30, 2024, 15:23:32 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[99] Where was I today, 29.04.24?
[73] Visiting the pub on the way home.
[53] Train drivers "overwhelmingly white middle aged men"
[49] Infrastructure problems in Thames Valley causing disruption el...
[38] Clan Line - by Clan Line !
[32] South Western Railways Waterloo - Bristol services axed
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
  Home Help Search Calendar Login Register  
  Show Posts
Pages: 1 2 [3] 4 5 ... 13
31  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 21:28:43
...the major station it's turning into

It does look like an important suburban station, arguably the only one in the Greater Bristol area.
Depends how you think of Parkway...

Access is a major issue for it.  As Red Squirrel said trying to access it by car is virtually impossible, which is the main reason I never got around to taking any pics from the station itself during the blockade.  Was much easier access via Kipling Road / Wallscourt Rd South and onto the footbridge just to the south of the station, which again as RS mentioned would offer much better pedestrian access from Filton Avenue itself had they put in an additional entrance / exit footpath there.  But even then it involved some pretty detailed map reading to make sure I knew exactly where to find access to the footpath itself

It's basically now turned into an interchange station which is what i've used it for in the past.  Timing it right I can park up at BPW» (Bristol Parkway - next trains), get the first stopping train to FIT, and then pick up one of the CDF» (Cardiff - next trains)-TAU» (Taunton - next trains) / CDF-PMH stopping services to get to where I wanted to go

I'm guessing that was one of it's greatest uses when it was the original Filton Junction station sited north of Station Rd bridge, and of course there was no Parkway station back then either, well not when all 4 platforms of Filton Junction were still in use anyway!
32  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 14:05:40
Excellent pics, thanks for those!  Great to see it all completed now...  and with the existing platforms extended and re-surfaced looks more like the major station it's turning into  Smiley
33  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 13:46:53
That does sound likely, doesn't it? For BRI» (Bristol Temple Meads - next trains)-bound passengers that would be seen as an advantage of the new arrangement; I wonder what the time-penalty was for the CFN (Clifton Down station)-bound passengers?

It's a benefit for now with the existing timetable, but with the desire to get more stopping services that would definitely become an issue

I'm assuming that either the half hourly departures from PWY on the CDF» (Cardiff - next trains)-TAU» (Taunton - next trains) / CDF-PMH harbour will be amended at some point in the future to stop at LWH & SRD, along with the new Ashley Hill station when it opens

Plus the hourly BPW» (Bristol Parkway - next trains)-WSM which calls at both stations on it's return from WSM but not on the way there

At the moment there's no daytime trains at all between PWY & LWH/SRD, and one an hour (sometimes once every two hours) from BPW

Don't get me wrong, it's been really interesting following all the paths the last couple of days and seeing how the new main lines have allowed the XC (Cross Country Trains (franchise)) / Freight & some CDF services to be run up these freeing up the reliefs, but a lot more thought will be needed to accomodate all of the planned additional local services without adding extra delays on existing ones
34  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 11:59:20
I think the regulation problems have now shifted to Bristol East Junction (well aren't we supprised).  Its not the best of layouts and needs to be the next target for rearrangement (think it was going to happen pre-electrification; so who knows when now Roll Eyes).

As with everything, you remove one bottleneck and it highlights another...  I can see the single line between Narroways and CFN (Clifton Down station) also becoming an issue as time goes on, especially as one of the benefits of four tracking was to enable more stopping services at both SRD and LWH
35  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 11:39:39
It seems to me that delays are still very much a thing on the Severn Beach line... staring at TrackIt, many of these seem to originate at Bristol East...

I noticed a lot of Beach line delays yesterday on TrackIt too

One of the biggest problems then seemed to be BRI» (Bristol Temple Meads - next trains) bound services waiting at CFN (Clifton Down station) for the AVN / SVB services to arrive so they could crossover before the single line stretch to Narroways

In one case then, and again this morning, the BRI bound service departed to prevent it running any later leaving the CFN bound service stuck at SRD for ages til the single line was cleared (and another PMH-CDF» (Cardiff - next trains) service was redirected up the main line)

Am guessing before that there's no way they'd allow that to happen and they'd hold the other train at CFN to clear the Up lines, but now with the opportunity to bypass trains held at LWH & SRD they've started doing that?
36  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 22, 2018, 10:45:44

I am surprised because, although I knew that P3 would no longer be used for Cardiff-bound trains I thought that the new P4 was to replace that so I hadn't been expecting P2 to be facilitated for Cardiff services too.

Dave

I'm wondering if they've still been overriding ARS (Automatic Route Setting) this week looking at some of the train movements, which is why some Cardiff bound trains have been run into P2 instead of P4

There's been several instances of PMH-CDF» (Cardiff - next trains) / TAU» (Taunton - next trains)-CDF services being run up the main lines to avoid delayed services on the reliefs, the same as there's been delayed XC (Cross Country Trains (franchise)) services being run into P1 at the last minute at BPW» (Bristol Parkway - next trains) to prevent holding up on-time PAD» (Paddington (London) - next trains) services, and then run into P2 at all other times if they're on time / not holding up other services
37  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 21, 2018, 10:58:30
I think I'll call it "Game Over".

Or...  you could go back to your original user name...  bear with me here!

To get Bristol electrified, they want to remodel Bristol East Junction, which would also involve
Laying new tracks into the Midland Shed, which would also involve
Removing Bristol Panel Box, which would also involve
Transferring signalling from Bristol South to Cogload junction to TVSC» (Thames Valley Signalling Centre - about) or elsewhere, which would also involve
Additional signalling to be introduced to allow more stopping services at BMT & PSN and the re-opened Portishead line, which would also involve
Four Tracks, Now! to be reintroduced from Bristol West Junction to Parson Street Junction!

Go on, you know you want to!  Wink
38  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 21, 2018, 10:27:33
Three Tracks (in the old Midland Shed), Now!  Wink

Three? Are you planning for a releasing road?

Oh, of course; we'll need to cater for all those kettles they insist on in today's modern railway..! Smiley


Exactly!  Wink
39  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 21, 2018, 09:48:57
Three Tracks (in the old Midland Shed), Now!  Wink
40  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 20, 2018, 10:56:43
Thats correct.  There are no crossovers to get you from Filton Abbey Wood Platform No.4 to Bristol Parkway (referring to the posted diagrams).

Yeah sorry I meant they'd need to change the new P2 sign to also indicate trains to BRI» (Bristol Temple Meads - next trains) if they were running from P2 along with P1 & P3, rather than just northbound via BPW» (Bristol Parkway - next trains) as it now says (which is the only path to BPW like you said)

Otherwise it could cause even more confusion with 3 platforms to choose from for BRI
41  Journey by Journey / Bristol (WECA) Commuters / Re: Something rather special - near Bristol - 16th Feb 2019 on: November 20, 2018, 10:51:13
So how long are you gonna keep us in suspense for then Grahame?!
42  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 20, 2018, 10:49:10
I was assuming that P1 and P3 would be for all services to BRI» (Bristol Temple Meads - next trains) depending whether they came from BPW» (Bristol Parkway - next trains) or PWY like they have been since yesterday, with P2 available for bidirectional working in case of delays etc.  Happy to be wrong

They'll need to change the new signs tho from those Red Squirrel posted pics of the other day, as they indicate P2 for all trains north via BPW...

http://www.firstgreatwestern.info/coffeeshop/index.php?topic=13113.msg251924#msg251924
43  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 19, 2018, 16:44:06
Looks like things on the move again...  phew!

Don't want the press getting hold of any teething problems on the first day, cos teething problems is what they are!   Smiley
44  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 19, 2018, 16:32:39
Not sure if it's a signalling issue, but for the past hour or so there's been delays on the Up Main from just south of FIT on to BPW» (Bristol Parkway - next trains)

Trains running up the bank and then getting stuck behind each other for around 10 minutes before they eventually proceed onto BPW

1M93 to MAN the latest casualty...  left BRI» (Bristol Temple Meads - next trains) 1 minute late, just been stuck for 23 minutes   Sad

Up Main and both relief's seem to be ok tho
45  Journey by Journey / Bristol (WECA) Commuters / Re: Four track for Filton Bank - ongoing discussion on: November 19, 2018, 13:51:42
Think they all need a bit of time to catch up

Main thing is the service itself is running and already improving service from the start
Pages: 1 2 [3] 4 5 ... 13
Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page