I suspect these are really easy. Try ALL FIVE and I'll tell you how many are right.
... and I suspect that the first one may provide slightly more of a puzzle than the rest.
All correct - bonus mark, as suggested by BNM, to Chris. All pictures taken last month or this, Cambridge on Sunday evening where the station at long last has more than one through platform.
Interesting design issues at Cambridge.
1. I got into the very rear of a train an Kings Cross - right by the barrier, then had to walk all the way forward (8 cars) at Cambridge to get off the new platform as the footbridge is forward, then back (around 4 or 5 car lengths) to the station exit. Why haven't they put the footbridge at the same point on the platform as the exit?
2. The new footbridge has a lift, but a tiny one. 8 car train from London, busy, lots of luggage ... and there's a LONG queue of people waiting for the lift to get off the platform and out of the station.
Oh dear ... took so long to get out of the station that the next train from KX was pulling in as I got to the exit gate!