Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 15:35 28 Apr 2024
- Jet with 500 toy giraffe passengers takes flight
- The cargo ship that became an iconic music venue
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
28th Apr (1996)
GNER franchise (Sea Containers) starts on ECML (*)

Train RunningCancelled
14:28 Hereford to London Paddington
28/04/24 17:16 Bristol Temple Meads to Severn Beach
28/04/24 18:01 Severn Beach to Bristol Temple Meads
19:21 Reading to Gatwick Airport
21:16 Gatwick Airport to Reading
22:10 Taunton to Bristol Temple Meads
Short Run
15:44 London Paddington to Great Malvern
Delayed
10:50 Penzance to Cardiff Central
11:37 London Paddington to Carmarthen
12:23 London Paddington to Paignton
12:53 London Paddington to Plymouth
13:00 Cardiff Central to Penzance
13:51 Warminster to Cardiff Central
14:24 Exmouth to Paignton
14:57 Exmouth to Paignton
15:02 Plymouth to London Paddington
15:15 Plymouth to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 28, 2024, 15:54:13 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[152] Clan Line - by Clan Line !
[28] access for all at Devon stations report
[28] Who we are - the people behind firstgreatwestern.info
[12] Labour to nationalise railways within five years of coming to ...
[11] Cornish delays
[1] Bonaparte's at Bristol Temple Meads
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 [2]
  Print  
Author Topic: Main line electrification starting December 2013  (Read 20101 times)
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #15 on: November 05, 2013, 23:28:29 »

Maybe it had to be Bullied to reach that sort of speed. Grin
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #16 on: November 06, 2013, 09:05:41 »

Oops probably not bullied they never did discover, on the Rugby test plant, how nuch steam one of his boilers would make even with two firemen
Logged
James
Sr. Member
****
Posts: 173

Be happy and helpful to all people you meet.


View Profile
« Reply #17 on: February 17, 2014, 10:44:19 »

Electrification starting December 2013?

Apart from seeing a few posts around the Reading area of Electrification, is the electrification actually happening further afield than Reading or has it stalled?

I appreciate the weather and other factors have played a part in the delay of the electrification project but it does seem to have stalled or is moving slowly, anyone know other reasons why?
Logged

Be smart and help one another, if the other is in need, just common curtisy Wink
paul7575
Transport Scholar
Hero Member
******
Posts: 5318


View Profile
« Reply #18 on: February 17, 2014, 12:18:29 »

'Electrification' has been underway for a couple of years, because the whole project includes stuff like bridge rebuilding and/or track repositioning for OHLE clearance.  Then there's road access to build substations and network connection points and stuff.

The more visually obvious stuff like the masts takes some while to appear, but it doesn't mean nothing is happening, there are piled and excavated foundations for electrification masts around the Didcot area for instance.

I'd say it is wrong to say anything has stalled - it was never likely to start instantly with masts and wires appearing somewhere the very next day.

Paul
Logged
James
Sr. Member
****
Posts: 173

Be happy and helpful to all people you meet.


View Profile
« Reply #19 on: February 17, 2014, 12:31:48 »

'Electrification' has been underway for a couple of years, because the whole project includes stuff like bridge rebuilding and/or track repositioning for OHLE clearance.  Then there's road access to build substations and network connection points and stuff.

The more visually obvious stuff like the masts takes some while to appear, but it doesn't mean nothing is happening, there are piled and excavated foundations for electrification masts around the Didcot area for instance.

I'd say it is wrong to say anything has stalled - it was never likely to start instantly with masts and wires appearing somewhere the very next day.

Paul

Sorry, just so much as been going about it for years, and hoping that things would move quickly, but thanks for clarifying this.
Logged

Be smart and help one another, if the other is in need, just common curtisy Wink
stebbo
Hero Member
*****
Posts: 445


View Profile
« Reply #20 on: February 17, 2014, 14:24:52 »

The bridge works at Oxford - which have caused controversy in the flooding issue (see separate postings) - and the row over closure of a level crossing serving some allotments at Oxford are to do with the pre-electrification work.

By the way, didn't the Southern Railway start off with overhead electrification in the early 20th century, then switch to third rail? As I recall, the third rail was originally meant for the densely worked London suburban services but when steam was withdrawn the third rail was expanded as the overhead electrification was by then long gone.

Also, wasn't the original Liverpool Street overhead electrification done at 15kv?
Logged
Alan Pettitt
Sr. Member
****
Posts: 229


View Profile Email
« Reply #21 on: February 17, 2014, 18:14:08 »

Not quite, the London Brighton and South Coast Railway had electrified about 24 miles of track with overhead equipment at 6,600v AC but after grouping to form the Southern it was converted to third rail.
Logged
DidcotPunter
Sr. Member
****
Posts: 166


View Profile Email
« Reply #22 on: February 17, 2014, 18:20:20 »

The bridge works at Oxford - which have caused controversy in the flooding issue (see separate postings) - and the row over closure of a level crossing serving some allotments at Oxford are to do with the pre-electrification work.

By the way, didn't the Southern Railway start off with overhead electrification in the early 20th century, then switch to third rail? As I recall, the third rail was originally meant for the densely worked London suburban services but when steam was withdrawn the third rail was expanded as the overhead electrification was by then long gone.

Also, wasn't the original Liverpool Street overhead electrification done at 15kv?

Indeed there is plenty of pre-electrification work being undertaken across the route and more is planned this year.  Mast foundations are being installed between Reading and Didcot - there is a large store of electrification equipment being assembled at Moreton Cutting. I believe that the High Output HOPS train for OHLE installation is now at Swindon (at least some of it is) and is due to start work later this year.  Clearance work is being undertaken at Foxhall Junction just west of Didcot Parkway to make way for the 400kV feed from the National Grid. Positions for mast bases are now marked out around Didcot station. I think it's a case of watch this space.

The LBSC Railway, one of the constituents of the Southern, electrified the South London Line from Victoria to London Bridge using overhead electrification at 6.7kV 25Hz AC in 1909. I believe that the wires were subsequently extended to Coulsdon. When the Southern Railway took over they decided to standardise on the 660V third rail system which was already in use on the LSWR (London South Western Railway), another constituent company.  One could argue with hindsight that this was a retrograde step.

The Liverpool St to Shenfield part of the GEML (Great Eastern Main Line) was electrified at 1.5kV DC (Direct Current) in 1949 - this was an LNER» (London North Eastern Railway - about) scheme which was completed post-war after nationalisation. It was subsequently extended to Chelmsford and Southend Vic in 1956 and the whole system converted to 25kV AC in 1962 when the Great Eastern suburban electrification was commissioned.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10120


View Profile
« Reply #23 on: February 18, 2014, 14:24:08 »

I believe it was hoped to let the new HOOP track machine loose, which is when things will really start getting noticeable, in March?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #24 on: February 18, 2014, 19:06:12 »


It's a mistake to think that 3rd rail is dc and o/h is ac.

Alongside 3rd rail electrified lines, in a cable trough, runs an oil-filled cable at 33kV (11kV on LUL (London Underground Ltd) and Merseyrail). Only at the substations, 3-5 miles apart is this switched, transformed, protected and rectified. Going East from Reading these are at Reading, Winnersh, Wokingham, Bracknell etc, with isolating sectioning cabins in between. One could swop all of this restrictive clutter for a modern catenary system, with the existing main transformer secondary winding re-wound with fewer turns to give 25kV rather than 33kV. Modern emu's are essentially dual voltage - supposedly only a depot-fit job.

100 years ago, there were no solid state rectifiers, inverters or power control, no vacuum switchgear, no digital data transmission, no XLPE insulation and no mechanised installation systems. It's a marvel that the engineers of the time achieved so much but I don't think that we will be the least disappointed by the present generation of engineers, now that it has some money to spend.

OTC
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #25 on: February 18, 2014, 20:06:16 »


......... with the existing main transformer secondary winding re-wound with fewer turns to give 25kV rather than 33kV.

The primary rectifier transformer is 33kV the secondary is typically 300V ish depending on how its wound, the rectification give 750V dc.  The 33kV network is not suitable to provide practical power at 25kV.

The current practice on Network Rail for ac OLE (Overhead Line Equipment, more often "OHLE") traction is to distribute at 50kV using the symmetrical auto transformer system ie 25kV - 0 - 25kV there is an aerial feeder wire which at 50kV to the contact wire both of which is 25kV to rail.  (elsewhere in the world an asymmetrical system is be investigated 50kV - 0 - 25kV)

The Grid feeds on the GWML (Great Western Main Line) in England will be located at Kensal Green, Didcot and Melksham!!! the system will be auto transformer 25 - 0 - 25 kV
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #26 on: February 18, 2014, 23:34:08 »

The primary rectifier transformer is 33kV the secondary is typically 300V ish depending on how its wound, the rectification give 750V dc.  The 33kV network is not suitable to provide practical power at 25kV.


The main TF at the Reading grid supply point, probably has a ratio of 132/33. My point is that it could easily be 132/25. A direct ac supply would have lower impedance and losses and so would be able to supply much more power than via the pointless dc substations.

A 2x40MVA supply from the 400kV supergrid is fine for high demand areas but is OTT (Open Train Times website) for suburban line conversions.

Engineering is optimising value for money, not spending a budget.


OTC
Logged
bobm
Administrator
Hero Member
*****
Posts: 9843



View Profile
« Reply #27 on: February 19, 2014, 01:15:25 »

From ThisisOxfordshire

Quote
THE timetable for a rail scheme that could cause months of disruption for the county^s motorists has been scrapped.
 
Network Rail has said a schedule it gave for rebuilding 28 bridges in the county is ^out the window^ after it admitted the original plans were not right.
 
But the company has now said that communities may only get four weeks^ notice ^ rather than the months of advance warning people were given when the plans were first revealed.
 
The scheme caused dismay after plans were announced late last year, with people worried about road disruption and councils raising fears about a lack of consultation.
 
The rail infrastruture company has now promised to give ^at least^ four weeks^ notice for each road closure.
 
But unlike in December, when the whole plan for the works was shown, there will be no full schedule released in one go.
 
The firm has said it will redraw the timetable after admitting the original one was ^misleading^.
 
The company needs to modify or rebuild the bridges over the next four years as part of its ^1bn electrification of the Great Western Mainline from London to Cardiff.
 
To put in overhead electric lines to power new trains, the company needs to raise several Victorian bridges by several feet.
 
It will need to close 19 roads, possibly for up to four months at a time, and in December gave the Oxford Mail a timetable for possible closures.
 
But senior project manager Nigel Fenn has now said: ^Those dates are all out the window.
 
^They were misleading. They would have been formulated over a year ago and train operating companies have produced new timetables since then.^
 
Mr Fenn said Network Rail has to notify the train operators of engineering work as much as two years in advance and work around their timetables ^ which have now changed since the original plans were made.

The line between London and Oxford via Didcot is due to be electrified by January 1, 2017.
 
The rest of the main line from Didcot to Bristol and South Wales, including the Oxfordshire stretch to Swindon, must be finished by January 1, 2018.
 
Under plans first revealed late last year, Network Rail said it could begin work on several schemes in the county at the start of 2014.
 
However, only one of those schemes has so far begun ^ at Fulscot Bridge in South Moreton ^ and all the other schemes that will take place over the next four years have yet to start.
 
Network Rail^s head of consents and environment, Nia Griffiths, said two or three Oxfordshire bridge modifications would start in the next six months, but the only one the company could reveal was a footbridge at Goring and Streatley station.
 
The firm said it does not need to consult ^ but is doing so anyway.

Mr Fenn said: ^We have permitted development rights. I can do whatever I like to the bridge, and we are given those rights by the Government.
 
^But we don^t like to enforce that and cause trouble.^

But the mayor of Wantage, Fiona Roper, said the town council had never been consulted over plans to raise Station Road bridge north of Grove by 1.3 metres.
 
She said: ^I think it is a shame they haven^t approached us. I am assuming they^re going to a higher level, the county council, but it would be nice to have a say.^
 
In January, Oxfordshire County Council rejected an application by Network Rail to close the road for up to six months from February 10, forcing Network Rail to look into other ways to carry out the work.
 
At the moment, the last road closure is due to begin at Christmas 2015.

Ms Griffiths said: ^We will give the Oxford Mail the dates for each of them as early as we can, which is as soon as it has been agreed with the county council.^
 
Wantage and Didcot MP (Member of Parliament) Ed Vaizey, said: ^m very concerned about the process Network Rail is undertaking.
 
^There is a lot of evidence that it has not been well managed elsewhere. I am still trying to secure a meeting with them, but they are proving elusive. My constituents cannot afford the chaos and disruption which seems likely to take place without proper planning.^
 
Network Rail spokeswoman Anne-Marie Batson said: ^This programme is really fluid.
 
^One day we might say one thing then a week later it is something else but there is always a reason behind that.^
 
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #28 on: February 19, 2014, 20:11:44 »

The primary rectifier transformer is 33kV the secondary is typically 300V ish depending on how its wound, the rectification give 750V dc.  The 33kV network is not suitable to provide practical power at 25kV.


The main TF at the Reading grid supply point, probably has a ratio of 132/33. My point is that it could easily be 132/25. A direct ac supply would have lower impedance and losses and so would be able to supply much more power than via the pointless dc substations.

A 2x40MVA supply from the 400kV supergrid is fine for high demand areas but is OTT (Open Train Times website) for suburban line conversions.

Engineering is optimising value for money, not spending a budget.


OTC

I see where you were coming from, 132kV is still used although it is not favoured, the imbalance caused by the single phase 25kV on the 132kV network can cause negative phase sequence and the resultant harmonics.  In addition the 132kV network is no longer part of the "National grid" whilst it is regarded as transmission it does not have the security of supply like the 400kV grid, NR» (Network Rail - home page)'s security of supply at 33kV is achieved by the number of intakes it has from the DNO (Distribution Network Operator)'s (Distribution Network Operator).

NR is the largest private high voltage network in the UK (United Kingdom), and is possibly the largest dc network operator in the world
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 [2]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page