Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 21:35 26 Apr 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
26th Apr (2016)
DOO strikes start on Southern (link)

Train RunningShort Run
20:00 London Paddington to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 26, 2024, 21:46:17 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[141] Labour to nationalise railways within five years of coming to ...
[73] access for all at Devon stations report
[47] Who we are - the people behind firstgreatwestern.info
[17] Bonaparte's at Bristol Temple Meads
[3] Lack of rolling stock due to attacks on shipping in the Red Se...
[2] Cornish delays
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Platform extensions at non Crossrail stations?  (Read 5391 times)
autotank
Transport Scholar
Sr. Member
******
Posts: 241


View Profile
« on: January 27, 2015, 15:47:24 »

Hello,

Just wondering of anyone knows if platforms will be extened between Reading and Oxford/Newbury in conjunction with the electrification works? Currently many of the stations can only just take 6 car trains - will they need to be lengthened to take longer electric trains? Also what will happen to Appleford and Culham which might struggle to even take 4 (assuming that is how long the EMUs (Electric Multiple Unit) will be?!).

Thanks - apologies if this is covered elsewhere
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7170


View Profile
« Reply #1 on: January 27, 2015, 16:14:05 »

The answer is a definite maybe. There is a project in CP5 (Control Period 5 - the five year period between 2014 and 2019) looking at it, which may result in platform extensions on a case by case basis:
Quote
Thames Valley Electric Multiple Unit Capability Works

Project reference code: W004
HLOS (High Level Output Specification) driver: Other electrification projects
Operating route: Western
Last updated: March 2014

CP5 output driver
To provide infrastructure capability enhancements to enable the operation of EMUs (Electric Multiple Unit) in the
Thames Valley area ^ Paddington to Newbury, Oxford and associated branch lines. This
will enable additional capacity and a cleaner environment. Capacity is as per Great Western
Main Line and Thames Valley branch electrification.

Scope of works
Network Rail believes that the constituent parts of these infrastructure capability works are
as follows:
  • gauge clearance for the new or cascaded EMUs in the Thames Valley - it is expected that
    all gauging works will be covered under the IEP (Intercity Express Program / Project.) capability workstream as the kinetic
    envelope for a Class 319 is inside the new Class 800 and Class 801 trains and the
    Class 16x that it replaces; and
  • a review of station operations at all stations where EMU trains are due to stop; this may
    result in changes such as: platform extensions; selective door opening; revisions to
    permissive working for attaching, detaching; platform sharing arrangements and
    alterations to signal controls and signal locations to deal with changes to train operations
    and alterations to DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) equipment (CCTV (Closed Circuit Tele Vision), lighting and mirrors).
    DfT» (Department for Transport - about) have indicated that the initial EMU operations will utilise class 319 units operating up to
    12-car in length over the following core route sections:
Core routes
  • Paddington to Oxford.
  • Slough to Windsor and Eton Central.
  • Maidenhead to Marlow.
  • Twyford to Henley.
  • Reading to Newbury.
  • Reading to Basingstoke.
...
« Last Edit: January 27, 2015, 17:45:25 by stuving » Logged
lordgoata
Transport Scholar
Hero Member
******
Posts: 415



View Profile
« Reply #2 on: January 27, 2015, 16:26:56 »

Hello,

Just wondering of anyone knows if platforms will be extened between Reading and Oxford/Newbury in conjunction with the electrification works? Currently many of the stations can only just take 6 car trains - will they need to be lengthened to take longer electric trains? Also what will happen to Appleford and Culham which might struggle to even take 4 (assuming that is how long the EMUs (Electric Multiple Unit) will be?!).

Thanks - apologies if this is covered elsewhere

Goring is currently being drastically overhauled as part of its ^3.2million upgrade, and that includes platform extensions. They have extended platform 1 on the mainline already but I'm not sure if the other platforms will be extended - I suspect not as platform 1 is now the same length as the others.
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #3 on: January 27, 2015, 18:08:59 »

In my part of the world, stations like Midgham and Aldermaston and are definitely going to need work, even to accommodate a 4-car EMU (Electric Multiple Unit).

Thatcham I think can fit 5 or 6 cars and Theale is similar.

Quite a bit of work to do, methinks.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page