Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 18:15 27 Apr 2024
- Boy finds rare Lego toy on beach after two-year search
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

No 'On This Day' events reported for 27th Apr

Train RunningCancelled
15:09 Gloucester to Weymouth
17:59 Gatwick Airport to Reading
18:45 Bristol Temple Meads to Salisbury
20:13 Salisbury to Bristol Temple Meads
Additional 20:57 Bristol Temple Meads to Cardiff Central
21:01 Severn Beach to Bristol Temple Meads
21:28 Westbury to Salisbury
Short Run
17:43 Bristol Temple Meads to Salisbury
18:10 Gloucester to Westbury
18:12 Salisbury to Cheltenham Spa
19:10 Weston-Super-Mare to Severn Beach
19:13 Salisbury to Worcester Shrub Hill
22:13 Salisbury to Bristol Temple Meads
Delayed
15:15 Plymouth to London Paddington
16:27 Cardiff Central to Portsmouth Harbour
17:23 Portsmouth Harbour to Cardiff Central
17:27 Cardiff Central to Portsmouth Harbour
18:27 Cardiff Central to Portsmouth Harbour
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 27, 2024, 18:27:58 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[91] Labour to nationalise railways within five years of coming to ...
[47] access for all at Devon stations report
[30] Who we are - the people behind firstgreatwestern.info
[11] Bonaparte's at Bristol Temple Meads
[2] Lack of rolling stock due to attacks on shipping in the Red Se...
[1] Cornish delays
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 76 77 [78]
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 286536 times)
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 7800



View Profile
« Reply #1155 on: July 01, 2023, 07:59:18 »

I see it runs to 144 pages, any chance of a summary of the most important points?

Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5219


There are some who call me... Tim


View Profile
« Reply #1156 on: July 01, 2023, 12:09:45 »

More waffle.

That's as as may be ..........

However politicians, policy influencers, DfT» (Department for Transport - about) etc will use this report to support their particular objective regarding railway electrification for many years to come

...which, if I've read it right, is a bit depressing really.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
stuving
Transport Scholar
Hero Member
******
Posts: 7170


View Profile
« Reply #1157 on: July 01, 2023, 14:31:53 »

I see it runs to 144 pages, any chance of a summary of the most important points?

Well, there's section 7.1 "summary". But it is worth showing the very first section:
Quote
1.1 Study profile

The DfT» (Department for Transport - about) commissioned SYSTRA, and subconsultants Tavistock Institute of Human Relations (Tavistock Institute or TIHR), to undertake a first post-opening evaluation for key elements of the Great Western Route Modernisation (GWRM) and related investments, primarily in respect of the long-distance service provision.

The specific objective of the study is to provide an assessment of the benefits delivered by the GWRM programme to date, including a value-for-money assessment of the long-distance service components in the form of a post-opening cost-benefit analysis. The evaluation also considers how the scope of works has changed within the programme lifecycle, and the impact this has had upon the achievement of intended objectives.
Quote
7.1 Summary

This first post-opening evaluation indicates that the GWRM programme has broadly met the founding expectations with regard to delivering passenger benefits.

The programme was descoped to control costs, but with little impact on the overall passenger benefits. It has delivered expected capacity increases, journey time and frequency improvements and, although it is not quite at the target set, reliability has improved significantly and is above the level achieved by most other long-distance operators.

The descoping of the programme has resulted in a slight reduction of environmental benefits compared to founding expectations but has still substantially contributed to reducing GWR (Great Western Railway)’s environmental impact. The environmental benefits from the programme have not been eroded as much as might have been expected as much of the impact of the descoping has been offset by other decisions made, particularly to procure all bi-modal trains for the long-distance fleet.

At this early stage of evaluation, it is not possible to assess how the programme has contributed to wider social and economic vitality and regional development. However, the expansion in capacity and reduction in journey times already delivered by the programme would point towards the potential to meet these wider objectives in the longer term.

In the 2015 Business Case, driven by a monetised economic appraisal, the GWRM programme was initially expected to deliver a ’High Value for Money’ as categorised by the DfT in their Value for Money guidance. Following the cost increases observed in the early delivery stages, the updated appraisal of 2017 reassessed this allocation and suggested the programme would delivery ‘Low Value for Money’. The assessment in this evaluation suggests that while the long-distance components of the programme may be expected to generate a higher monetised benefit to cost ratio, the value for money allocation would remain as ‘Low’.

Of course some of that doesn't make much sense without reading other bits as well.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7170


View Profile
« Reply #1158 on: July 01, 2023, 14:43:45 »

POPE (post-opening project evaluation) has been a routine part of how Highways England manages projects for 15 years. ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) even did a study of POPE studies. It's all part of "benefits management", a term I suspect we'll hear more of in railway projects. It ought not to make a lot of difference, though, since railway planners don't tend to lose sight of the benefits being asked for as much as some others.
Logged
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #1159 on: July 17, 2023, 12:39:36 »

What should have been included (if it's not) is a comparison of current costs (now we've spent time on the learning curve and don't drill through signalling cables etc) with current benefits.

Current costs are lower than those of the GWEP (Great Western Electrification Program) and more so if inflation is included.

The costs of the treasury/DfT» (Department for Transport - about) de-skilling Railtrack/NR» (Network Rail - home page) would therefore emerge.

The costs of not completing the peripherals (Oxford, Bristol) could also be evaluated

I imagine that's why MML» (Midland Main Line. - about) and TP wiring is continuing.

OTC
« Last Edit: July 18, 2023, 16:29:26 by onthecushions » Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7170


View Profile
« Reply #1160 on: December 08, 2023, 23:27:48 »

The builders of the Holly Cross ATFS (at Bramley) have now put in their (auto)transformer, and have made a video of it. As they (Enable Infrastructure) say:
Quote
The video showcases the entire process at Holly Cross from a green, pastoral field to the initial foundation works to the arrival and installation of crucial technology such as Transformers, Structure Mounted Outdoor Switchgear (SMOS) pallets, and the Module building.

It shows how now not only does switchgear perch on top of poles, but the poles arrive factory-assembled on pallets (as does the control shed). Holly Cross ATFS sits partway along a feeder from the grid to the railway at Reading, which is the only place it's connected to the OLE (Overhead Line Equipment, more often "OHLE"). Since it's the same kind of circuit - 25-0-25 kV - all the way, you may wonder why you need all this stuff including the AT connected across it at that point.

Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #1161 on: December 09, 2023, 11:15:45 »

The builders of the Holly Cross ATFS (at Bramley) have now put in their (auto)transformer, and have made a video of it. As they (Enable Infrastructure) say:
Quote
The video showcases the entire process at Holly Cross from a green, pastoral field to the initial foundation works to the arrival and installation of crucial technology such as Transformers, Structure Mounted Outdoor Switchgear (SMOS) pallets, and the Module building.

It shows how now not only does switchgear perch on top of poles, but the poles arrive factory-assembled on pallets (as does the control shed). Holly Cross ATFS sits partway along a feeder from the grid to the railway at Reading, which is the only place it's connected to the OLE (Overhead Line Equipment, more often "OHLE"). Since it's the same kind of circuit - 25-0-25 kV - all the way, you may wonder why you need all this stuff including the AT connected across it at that point.



I certainly wonder. But GCE O-level Physics in 1972 only just equips me with enough knowledge to grasp the basic theory, even if I did get top grade. I believe it effectively doubles the voltage applied to the engine by using split phase power and using the return current from the rail, at not much extra cost, but I'm sure someone will do a far better job of covering the point than that.
Logged

Now, please!
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1162 on: December 09, 2023, 13:50:23 »

The builders of the Holly Cross ATFS (at Bramley) have now put in their (auto)transformer, and have made a video of it. As they (Enable Infrastructure) say:
Quote
The video showcases the entire process at Holly Cross from a green, pastoral field to the initial foundation works to the arrival and installation of crucial technology such as Transformers, Structure Mounted Outdoor Switchgear (SMOS) pallets, and the Module building.

It shows how now not only does switchgear perch on top of poles, but the poles arrive factory-assembled on pallets (as does the control shed). Holly Cross ATFS sits partway along a feeder from the grid to the railway at Reading, which is the only place it's connected to the OLE (Overhead Line Equipment, more often "OHLE"). Since it's the same kind of circuit - 25-0-25 kV - all the way, you may wonder why you need all this stuff including the AT connected across it at that point.


The switchgear is called SMOS lite (SMOS Structure Mounted Outdoor Switchgear) lite because the concept is lite in site construction and implementation compared to the 1990's SMOS.  The "control shed" or correctly the Ancillary Equipment Enclosure contains the Protection Relays, control and protection power supply battery chargers, SCADA (System Control And Data Acquisition,) etc. 

The 2 Auto-transformers at Holly Cross I am guessing is to ensure the Grid Transformer is presented with balance current on the 2 phases and not have any current on the Earthed Neutral.  The railways with its rail return on an AT system will present a Neutral current at the Grid transformer which cause circulating currents in the transformer and overheating.  The traction return current will find the shortest route back to the transformer and given the Berks and Hants is not that far away return current could find a fortuitous path


I certainly wonder. But GCE O-level Physics in 1972 only just equips me with enough knowledge to grasp the basic theory, even if I did get top grade. I believe it effectively doubles the voltage applied to the engine by using split phase power and using the return current from the rail, at not much extra cost, but I'm sure someone will do a far better job of covering the point than that.

The train is still powered at 25kV and not 50kV.  The power is distributed at 50kV one leg is the centenary the other is the Auto Transformer feeder wire, both are 25kV relative to Earth.  Distributing the power at 50kV reduces the I2R losses, the down side is every so often it needs a transformer and Auto Transformer which is a 25kV - 0 - 25kV transformer,
   
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Red Squirrel
Administrator
Hero Member
*****
Posts: 5219


There are some who call me... Tim


View Profile
« Reply #1163 on: February 02, 2024, 14:54:05 »

Quote
New plans to electrify train lines from Bristol Temple Meads to Parkway, Filton, Bath and Chippenham

Previous plans to upgrade railway tracks in the region were scrapped in 2016

New plans to electrify railway lines in the West Country, starting with tracks from Bristol Temple Meads station, have been announced by the region's metro mayor.

Under Dan Norris's scheme the lines from Temple Meads from the north via Bristol Parkway and Filton Bank will be electrified during the first phase, with the mayor then planning move on to the section of railway that runs from Bristol to Bath Spa and Chippenham in Wiltshire.

[...]

Mr Norris said on Thursday (February 1), a detailed study would take place, aimed at reducing the unit cost of electrification. In 2016, it was around £3.5m per single track km and the aim is to slash that to £1.5m, he said.

...read full article
Source: Business Live
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Red Squirrel
Administrator
Hero Member
*****
Posts: 5219


There are some who call me... Tim


View Profile
« Reply #1164 on: February 02, 2024, 14:57:25 »

The details are here: https://westofengland-ca.moderngov.co.uk/documents/s7726/Item%2015%20-%20Transport%20Infrastructure%20Projects.pdf

Section 78.4 says:

Quote
Survey the Bristol Temple Meads station train shed to prove that it could be
modified to take the loadings of ‘head spans’ or alternative solutions including
those adopted on tram lines (electrification infrastructure). If this is achievable,
it will avoid costly movement of railway signals and ease the impact on the
building’s Grade 1 heritage listing.

Should we be worried to hear the dreaded term 'head spans', or is it OK within the station?
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
Electric train
Transport Scholar
Hero Member
******
Posts: 4362


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1165 on: February 03, 2024, 08:08:41 »

The details are here: https://westofengland-ca.moderngov.co.uk/documents/s7726/Item%2015%20-%20Transport%20Infrastructure%20Projects.pdf

Section 78.4 says:

Quote
Survey the Bristol Temple Meads station train shed to prove that it could be
modified to take the loadings of ‘head spans’ or alternative solutions including
those adopted on tram lines (electrification infrastructure). If this is achievable,
it will avoid costly movement of railway signals and ease the impact on the
building’s Grade 1 heritage listing.

Should we be worried to hear the dreaded term 'head spans', or is it OK within the station?

Head spans in somewhere like Temple Meads station will be fine due to the low speed.

Head spans will be less intrusive than portals or single masts, Paddington and York are good examples of head spans in a grade listed station
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
stuving
Transport Scholar
Hero Member
******
Posts: 7170


View Profile
« Reply #1166 on: February 03, 2024, 10:30:45 »

Head spans in somewhere like Temple Meads station will be fine due to the low speed.

... and the absence of falling trees, flying gazebos, and flapping fertiliser bags, one hopes.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 76 77 [78]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page