Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 12:15 27 Apr 2024
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

No 'On This Day' events reported for 27th Apr

Train RunningCancelled
27/04/24 12:01 Severn Beach to Bristol Temple Meads
27/04/24 13:51 Worcester Foregate Street to Bristol Temple Meads
13:52 St Erth to St Ives
14:06 St Ives to St Erth
Short Run
09:58 Great Malvern to London Paddington
27/04/24 11:38 Bristol Temple Meads to Worcester Foregate Street
12:02 Westbury to Gloucester
27/04/24 12:49 Worcester Foregate Street to Bristol Temple Meads
12:52 London Paddington to Worcester Foregate Street
14:10 Gloucester to Frome
27/04/24 14:38 Bristol Temple Meads to Worcester Foregate Street
14:59 Cardiff Central to Penzance
27/04/24 15:38 Bristol Temple Meads to Worcester Foregate Street
17:43 Bristol Temple Meads to Salisbury
18:12 Salisbury to Cheltenham Spa
18:23 Portsmouth Harbour to Cardiff Central
19:13 Salisbury to Worcester Shrub Hill
Delayed
11:12 Salisbury to Worcester Foregate Street
14:02 Westbury to Gloucester
15:59 Cardiff Central to Taunton
An additional train service has been planned to operate as shown 20:57 Bristol Temple Meads to Cardiff Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 27, 2024, 12:23:15 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[97] Labour to nationalise railways within five years of coming to ...
[50] access for all at Devon stations report
[32] Who we are - the people behind firstgreatwestern.info
[11] Bonaparte's at Bristol Temple Meads
[2] Lack of rolling stock due to attacks on shipping in the Red Se...
[1] Cornish delays
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Reinstate Reading And Bristol Rail Plans - SWRA/SWRDA Tell ORR  (Read 2005 times)
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« on: September 08, 2008, 15:06:47 »

In its response to the Office of Rail Regulation^s draft determination of Network Rail^s Strategic Business Plan, the bodies have called for full support for Network Rail^s core high speed route strategy for the Great Western Main Line. They also demand backing for the infraco^s original plans to redevelop Reading station and a commitment to specific funds for schemes including a fourth platform at Bristol Parkway station that are required in order to achieve a Bristol Metro high frequency service (link below.)
http://www.rmtbristol.org.uk/2008/09/reinstate_reading_and_bristol.html#more

The SWRA and SWRDA» (South West Regional Development Agency - about) also want other rail schemes, such as Swindon to Kemble track redoubling and a Taunton to Westbury line speed increase, reinstated. They say that if accepted by the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about), the changes would help to ensure that the rail network and rail services are capable of meeting current and future demands of people, places and businesses in the south west.
« Last Edit: September 08, 2008, 15:09:35 by Lee Fletcher » Logged

Vous devez ĂȘtre impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1 on: September 26, 2008, 16:56:43 »

Does SWRDA» (South West Regional Development Agency - about) have any money on offer to make any of this happen?
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #2 on: September 27, 2008, 15:15:44 »

I thought Reading was now on, provided the WCML (West Coast Main Line) upgrade is finished satisfactorily and Networkrail doesn't have more millions confiscated for late running engineering work.
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #3 on: September 30, 2008, 16:52:05 »

My understanding is that the Reading upgrade is not in the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) document because it is not a project promoted by NR» (Network Rail - home page) inorder to meet the HLOS (High Level Output Specification) and is not subject to complex processes normally part of NR enhancements which include the ORR review.  It is funded separately with most of the money coming directly from DfT» (Department for Transport - about) (NR does make a small contribution as does the local council).  It is similar to the Birmingham New Street redevelopment in this respect and was anounced by Ruth Kelly in the same speech

The first stage of the work is about to start.  This involves the clearance of land to the north of the station which involves demolition of a signalling centre which can only happen when the signalling equipment is moved to Slough.  This will involve a lot of work and take some time and means that there will not be much visable activity on the ground for a while.

By 2010 the land ought to be clear and the 4 new through platforms to the North of the station will start being built.  Once they are in use, there will be spare capacity released to do the work on the existing station which includes lengthening (from 8 to 12 car) the two SWT (South West Trains) waterloo platforms and increasing their number to 3.  An old dive-under to the east of the station will be reopened to allow the FGW (First Great Western) Gatwick trains to access other platforms in the station further releaving pressure on the SWT platforms. 

To the west of the station the whole of the track layout is being revised to reduce conflicting movements with the biggest change being a new flyover so that Trains to Swindon and Westbury are kept separately and so that Crosscountry trains can exist and leave the station without crossing the path of FGW services.  Crosscountry will use current platform 4 in both directions which is long enough to accomodate trains longer than the 4-car voyagers which currently use the bay platforms to the west

The Reading Turbo depot will need to be moved out of the way.  It was suggested that it be moved to teh ex-Eurostar Northpole depot but this is now earmarked for the IEP (Intercity Express Program / Project.)/HST2 and a new depot near to reading will need to be build (so many turbo services start and end at Reading that this makes more sense anyway)

SWT gets three 12-car platforms in place of two 8-car platforms and gets Gatwick trains moved out of its way.

FGW and Crosscountry get 4 new through platforms although it Crossrail and/or airtrack comes to Reading some of these might be used by those trains. 

Conflicts between Crosscountry and FGW are removed

The passenger footbridge is being replaced to cope with more pedestrians although the barrierline and passenger concourse/ ticket office is not going to be expanded (although presumably this could be done later if required and would be a "simple building project" rather than a rail engineering project so hopefully wouldn't be hugely expensive to do 

All in all it is a fantastic and vitally important scheme.  You could even argue that it it of national importance because delays at Reading can be propergated to Aberdeen or Penzance (and vice versa).  The cost benefit ratio was apparently 1:4 which is very high and far ahead of many other worthwhile schemes.  I refuse to belive that it won't go ahead. 

« Last Edit: September 30, 2008, 16:54:20 by Tim » Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10119


View Profile
« Reply #4 on: September 30, 2008, 18:46:57 »

The first stage of the work is about to start.  This involves the clearance of land to the north of the station which involves demolition of a signalling centre which can only happen when the signalling equipment is moved to Slough.  This will involve a lot of work and take some time and means that there will not be much visable activity on the ground for a while.

I refuse to belive that it won't go ahead. 

It will be going ahead, Tim! Thanks for your detailed post - just one minor correction in that the signalling will be transferred to the new Thames Valley Signalling Centre at Didcot and not Slough.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #5 on: October 01, 2008, 09:18:03 »

The first stage of the work is about to start.  This involves the clearance of land to the north of the station which involves demolition of a signalling centre which can only happen when the signalling equipment is moved to Slough.  This will involve a lot of work and take some time and means that there will not be much visable activity on the ground for a while.

I refuse to belive that it won't go ahead. 

It will be going ahead, Tim! Thanks for your detailed post - just one minor correction in that the signalling will be transferred to the new Thames Valley Signalling Centre at Didcot and not Slough.



Didcot is right.  Thanks for the correction and confirmation that it is happening. 

I guess with such a huge project it takes a while for things to ramp up.  Do you know if any enableing work has started yet or are we still at the planning stage 

« Last Edit: October 01, 2008, 17:17:51 by Tim » Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page