Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:35 29 Apr 2024
- Depardieu in custody over sexual assault allegations
- Power cut causes disruption at Stansted Airport
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 22/05/24 - WWRUG / TransWilts update
02/06/24 - Summer Timetable starts
17/08/24 - Bus to Imber
27/09/25 - 200 years of passenger trains

On this day
29th Apr (1963)
Bristol Bus Boycott announced (*)

Train RunningCancelled
17:04 Didcot Parkway to Moreton-In-Marsh
18:51 Evesham to Oxford
Short Run
16:20 Reading to Gatwick Airport
16:29 Gatwick Airport to Reading
16:59 Gatwick Airport to Reading
17:29 Gatwick Airport to Reading
17:59 Gatwick Airport to Reading
Delayed
14:03 London Paddington to Penzance
14:48 London Paddington to Swansea
15:23 London Paddington to Worcester Foregate Street
15:28 London Paddington to Weston-Super-Mare
15:32 London Paddington to Cheltenham Spa
16:58 London Paddington to Great Malvern
17:28 Weston-Super-Mare to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 29, 2024, 17:54:33 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[144] South Western Railways Waterloo - Bristol services axed
[100] Clan Line - by Clan Line !
[88] Visiting the pub on the way home.
[78] Saturdays: Rochdale / Manchester onto the Settle and Carlisle
[53] Disabled access at Cholsey: time for a campaign!
[30] Labour to nationalise railways within five years of coming to ...
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 216 217 [218] 219 220 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1364274 times)
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1248



View Profile
« Reply #3255 on: August 12, 2015, 14:27:19 »

Thanks for that info II.

I do remain surprised that the flexibility for true bidirectional running wasn't implemented with this resignalling as it would appear to give one more potential up path for a Basingstoke stopper or XC (Cross Country Trains (franchise)) at the same time as a west country up fast or stone train.  No doubt there is a good reason.
Logged
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 752


View Profile
« Reply #3256 on: August 12, 2015, 18:46:19 »

I have to say that, having done a few hours on Adelante^s Reading signalling simulator, the layout in the Oxford Road Junction area works fine.  I^d commented earlier that it looks a bit odd and operationally limiting, but movements on the Feeder Main are usually in the Up direction so the lack of a parallel crossover for Down trains off the Feeder Main to the Down Westbury is no big deal.

Movements through P1 ^ P11 are relatively straightforward - it^s movements through P12-P15 that need the most concentration, especially if there are moves to/from the depot.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #3257 on: August 13, 2015, 10:32:35 »

There are adverts in the local press for engineering and project management posts with Spencer, working on the "extension and upgrade" of the Reading Train Care Depot. Which seems very odd, given it was only finished two years ago.

It's not for SET (Super Express Train (now IET)), though Spencer did do the fitting-out of all the SET stabling sites with Hitachi's support equipment (e.g. refuelling with metered Adblue). This is another contract they got afterwards.

Now there have been changes since RSAR was committed, notably Crossrail coming to Reading.  But why would that call for more than a little stabling? And electrification was far enough back for the depot design to reflect it, so switching from DMUs (Diesel Multiple Unit) to EMUs (Electric Multiple Unit) is a pre-planned development. In any case wouldn't that be more a case of shipping diesel-specific kit out west following the trains?

So what's to upgrade - and where can it expand to?

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #3258 on: August 13, 2015, 11:13:42 »

It's not for SET (Super Express Train (now IET)), though Spencer did do the fitting-out of all the SET stabling sites with Hitachi's support equipment (e.g. refuelling with metered Adblue). This is another contract they got afterwards.

Having re-read this from Railway strategies, Spencer's SET contract was only for East Coast. So this new contract might include that element, though as the GWML (Great Western Main Line) needs its SET depots earlier the timing seems odd.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5319


View Profile
« Reply #3259 on: August 13, 2015, 11:40:10 »


So what's to upgrade - and where can it expand to?


It could be a simple matter of extending the maintenance sheds or tanking/CET (Controlled Emission Toilet)  facilities by a short distance to allow for a different length of the typical trains, or multiple trains, now that the EMU (Electric Multiple Unit) fleet is known to be based around 4 x 20m units.  Other possibilities, perhaps they need to have more clear distance to allow a 12 car train through the wash plant, or maybe they need a longer space beyond the wheel lathe building?

I too cannot see much needing to be added due to Crossrail, if they were to need stabling at Reading overnight, it wouldn't be more than a couple of units, but perhaps they need minor alterations to make economical use of the sidings, as Crossrail are somewhere just over 200m long, I've seen 205 m quoted.

Perhaps there'll be another planning application online - shall have a look.

Paul   
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #3260 on: August 13, 2015, 13:44:54 »

I have seen an early plan that shows a number of IEP (Intercity Express Program / Project.) sidings in the Reading depot area.  I'll see if I can dig it out.......... Roll Eyes
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #3261 on: August 13, 2015, 14:41:15 »

I have seen an early plan that shows a number of IEP (Intercity Express Program / Project.) sidings in the Reading depot area.  I'll see if I can dig it out.......... Roll Eyes

Found it.  Health Warning: This is a very old concept drawing for the Reading Remodelling Project and should not be taken as gospel  Roll Eyes Tongue

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #3262 on: August 13, 2015, 15:21:42 »

I have seen an early plan that shows a number of IEP (Intercity Express Program / Project.) sidings in the Reading depot area.  I'll see if I can dig it out.......... Roll Eyes

Found it.  Health Warning: This is a very old concept drawing for the Reading Remodelling Project and should not be taken as gospel  Roll Eyes Tongue

That just confirms that this use was known when the depot/sidings area was designed. The long sidings hold 15 26m carriages, which is either suitable or impossible to change. I understood this to be just some extra parking space as there's not enough close to Paddington - does it need more "depot" built for that?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #3263 on: August 25, 2015, 00:53:22 »

For those friends of Reading Station who were wondering how the neighbours were doing, here's a belated update.

First, Thames Tower. You may recall it was going to be gutted, reclad, and heightened by a few storeys, and this is well under way. You can't see a lot, as they started by scaffolding it, then wrapped the scaffolding, and have now partly scaffolded the wrapped scaffolding. The picture below is not recent; now there is a lift up its side and a friendly tower crane is gazing fondly down on it.

Further down Station Hill the bus station has gone, and the demolition of Western Tower above that has just begun in earnest. Again it has been scaffolded and wrapped, and a tower crane erected. I expected that the plan would be to crane something like a JCB with a hydraulic breaker onto the roof, to knock a hole in it. Then the crane can drop an elevator/loader and the breaker vehicle through the hole and so on.

However, last week I could hear something much lighter - handheld pneumatic breakers - and see lengths of concrete beam being craned to the ground. So it was interesting to see the set of pictures getReading have just put on line, showing something rather heavier on its way up and, here, on the job.


In between the two towers the shops have all gone, and if the plan is still to create an interim public space there's not much in the way of that.
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6438


The artist formerly known as Four Track, Now!


View Profile
« Reply #3264 on: September 01, 2015, 19:41:22 »

I would guess that once it is down to 8 storeys or so, the big  nipper, such as was used at Bristol's New Bridewell police HQ (Headquarters), will finish the job off.
Logged

Now, please!
IndustryInsider
Data Manager
Hero Member
******
Posts: 10120


View Profile
« Reply #3265 on: September 05, 2015, 11:25:30 »

Looks like the electrification team have pretty much finished wiring the western end of the depot.  The eastern end was completed a couple of years ago, but the western end couldn't be finished until the final track layout was installed.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
stuving
Transport Scholar
Hero Member
******
Posts: 7173


View Profile
« Reply #3266 on: September 11, 2015, 19:26:26 »

Ooh, look! The OHLE fairies have been back to Reading again!

When the portals were put up (last spring), some were quite visibly out of true. Then in the autumn they were all adjusted to vertical, and the two-barred ones (for line termination) got one stay each (apart from those closest to the station).

Now I don't know whether the stays are for strength, rigidity, or both, but one is obviously not much use. Today I see that most of the missing second stays have been fitted. There are still a couple with just one, and one in the station with none, but the others do look ... well, happier, don't they?
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4453


View Profile
« Reply #3267 on: September 11, 2015, 20:41:53 »

Now I don't know whether the stays are for strength, rigidity, or both....

Without changing the verticals altogether of the material it is difficult to have strength without rigidity! So both!
Logged
ironstone11
Full Member
***
Posts: 75


View Profile
« Reply #3268 on: September 12, 2015, 11:01:22 »

Ooh, look! The OHLE fairies have been back to Reading again!

Now I don't know whether the stays are for strength, rigidity, or both, but one is obviously not much use.

The stays transfer the catenary tensioning forces to the ground. Thus reducing the bending forces on the uprights.

In the picture shown, assuming the stays are in compression, the OHL (Over-Head Line) will be coming from the left of the picture to be terminated on the portals.

Yes, two stays are needed otherwise the structure will twist.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10120


View Profile
« Reply #3269 on: September 17, 2015, 01:08:58 »

Stage Q has now been implemented in full as per the diagrams on the previous page (post #3251).

That pretty much finishes the job as far as alterations to the operational infrastructure are concerned, bar the 'knitting' going up.  'Stand back from the edge of the platform' announcements might be wise on platforms 9 and 10 as trains have never roared through Reading at 95mph before!

I'm sure the thread will rumble on with the remaining work to be done on the station forecourt, but this strikes me as the best moment to offer my congratulations to the whole team who have delivered such a magnificently flexible and enlarged station on time and on budget whislt the station remained open pretty much throughout.

If anyone's forgotten, the following alterations have happened since the first major work on the ground started in August 2010 when the goods lines were lifted:

1) Platforms 4a/4b replaced by Platforms 4/5/6 with longer and wider platform faces.
2) Platforms 4-10 replaced with Platforms 7-15 meaning instead of four through platforms and three bay platforms, there are now nine through platforms.
3) The overbridge and subway replaced with the massive new transfer deck with lifts/escalator/steps linking all platforms.
4) A new northern entrance to the station, with bus and taxi ranks.
5) Reinstatement of the underpass line east of the station.
6) More flexible signalling and track layout at the eastern end of the station, including a new passenger loop/turnback.
7) A new maintenance depot with three separate entrances for trains equipped with modern facilities and able to deal with electric trains.
8 ) Grade separation at the western end of the station with a viaduct reducing hugely the number of conflicting moves.
9) Two turnback signals at Tilehurst.
10) Additional passenger loop line at the western end of the station.
11) General modifications to track and signalling with many more routing options now available and increased linespeeds.

And the biggest grumbles of the whole project have been that the transfer deck leaks a bit when it's wet and windy and that the canopies could have been longer!

Perhaps others on the forum can 'like' this post in order to express their own appreciation to those involved?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 216 217 [218] 219 220 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page