Train Graphic
Great Western Passengers' Forum Great Western Coffee Shop - [home] and [about]
This site uses cookies - see [here] for details.
If you proceed, we will take that as your consent to accept cookies
Random Image
Current Train Running Road Report Acronyms/Abbreviations Station Comparator Rail News FGW co. site Site Style 1 2 3
May 25, 2013, 12:06:06 AM *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Login Register  
Pages: 1 ... 7 8 [9] 10 11 ... 15
  Print  
Author Topic: Crossrail  (Read 18549 times)
ChrisB
Hero Member
*****
Posts: 2684


View Profile Email
« Reply #120 on: October 01, 2011, 06:05:57 PM »

Optimist! :-)
Logged
lhrdave
Full Member
***
Posts: 66


View Profile
« Reply #121 on: October 03, 2011, 11:04:50 AM »

I had been under the impression for some time that Crossrail would call at all stations, which I thought would increase journey times. But looking at that link from Crossrail, I see that just as now, some trains will not call at all stations.

I hope they increase the off peak frequencies for West Drayton and beyond.
4tph for Heathrow + 4tph Express to Heathrow does seem excessive. The existing Connect services to Heathrow empty out at Hayes leaving only a few people continuing.
Logged
IndustryInsider
Hero Member
*****
Posts: 3306


View Profile
« Reply #122 on: October 03, 2011, 11:17:11 AM »

It's been mentioned before, but I'd probably wager a small amount of money on Heathrow Express, at least in its current form, ceasing to exist after Crossrail.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Zoë
Hero Member
*****
Posts: 574


View Profile
« Reply #123 on: October 05, 2011, 01:27:22 PM »

I had been under the impression for some time that Crossrail would call at all stations, which I thought would increase journey times. But looking at that link from Crossrail, I see that just as now, some trains will not call at all stations.

I hope they increase the off peak frequencies for West Drayton and beyond.
West Drayton would I expect be served by the 2 tph Paddington to Reading FGW service in addition to the 2 tph Crossrail service.  It had been planned to run more than 2 tph off peak to Maidenhead but the additional paths were rejected by the ORR.  Even if existing frequencies are retained west of Paddington there will still likely be an increase in capacity due to longer trains.
Logged
IndustryInsider
Hero Member
*****
Posts: 3306


View Profile
« Reply #124 on: October 18, 2011, 10:02:01 AM »

A working group has been set up by the business membership organisation London First to look at the Crossrail 2 scheme, which has been proposed to run from the Chelsea to Hackney areas:

http://www.london-first.co.uk/news/detail.asp?record=227

Two railway heavyweights are part of the group, the chairman is a chap called Andrew Adonis, who you may have heard of!  First's CEO Tim O'Toole involved as well.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
paul7755
Hero Member
*****
Posts: 2562


View Profile
« Reply #125 on: October 18, 2011, 11:32:59 AM »

You certainly get the impression from the London and SE RUS, which TfL have had a big input to as well, that no one seriously believes Crossrail 2 will be built as a simple tube line, as often previously described.

I think people in authority are definitely coming round to the idea of it taking over the SWML inner suburbans inbound from Raynes Park, and connecting them to somewhere in the North East, whether that is a branch of the Central Line, or part of the West Anglia mainline remains to be seen. If it is ever successfully argued that Crossrail 1 should run to Reading, then you might also expect somewhere like Woking to be a target. 

I also think if you are going to the trouble of a new tunnel under London it may as well be for proper sized 200/240 m trains, we've probably seen the last of 'tube trains' for new construction...

Paul
Logged
IndustryInsider
Hero Member
*****
Posts: 3306


View Profile
« Reply #126 on: December 13, 2011, 09:31:21 PM »

Interesting article about the Tunnel Boring Machines that are imminently arriving at Royal Oak:

http://www.guardian.co.uk/uk/2011/dec/13/crossrail-unveils-machines-from-germany

On the ground at Royal Oak an overhead gantry crane and other facilities are reaching the end of construction to enable the TBM's to be re-assembled before launch next spring.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Electric train
Hero Member
*****
Posts: 1553


The future is 25,000 Volts a.c.


View Profile
« Reply #127 on: December 14, 2011, 05:59:05 PM »

On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.
Logged

I work for the largest employer in the Rail Industry.
Electrification is what I do

Swindon engineering - if 3/8th steel plate is enough use 7/16th just in case.

George Jackson Churchward a true Engineer
paul7755
Hero Member
*****
Posts: 2562


View Profile
« Reply #128 on: December 14, 2011, 08:25:14 PM »

On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.

I hope they've chained it securely to a lamp post, what with these being boom times for 'metals recycling'...   Roll Eyes

Paul
Logged
Electric train
Hero Member
*****
Posts: 1553


The future is 25,000 Volts a.c.


View Profile
« Reply #129 on: December 14, 2011, 08:53:35 PM »

On your way into Padd as you go past the old goods shed at Westbourne Park (where the gantry crane has been erected) just to the East of this you can see the first of the TBM cutting heads being put together it is laying flat on the ground.

I hope they've chained it securely to a lamp post, what with these being boom times for 'metals recycling'...   Roll Eyes

Paul
Would have to be a mahuesive lamp post  Shocked
Logged

I work for the largest employer in the Rail Industry.
Electrification is what I do

Swindon engineering - if 3/8th steel plate is enough use 7/16th just in case.

George Jackson Churchward a true Engineer
paul7755
Hero Member
*****
Posts: 2562


View Profile
« Reply #130 on: December 15, 2011, 01:32:18 PM »

Article about the Crossrail TBMs here that may be of interest:

http://www.londonreconnections.com/2011/in-pictures-the-crossrail-tbms/

Paul
Logged
IndustryInsider
Hero Member
*****
Posts: 3306


View Profile
« Reply #131 on: December 15, 2011, 04:28:09 PM »

Interesting reading, Paul.  Thanks.
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Boppy
Sr. Member
****
Posts: 143


View Profile
« Reply #132 on: January 20, 2012, 10:13:00 AM »

Looks like 2 pieces of the tunnelling machine have arrived alongside the approach to Paddington.

There is a large white tent next to them too.  I guess this is the staging area where all the separate parts will be put together.
Logged
paul7755
Hero Member
*****
Posts: 2562


View Profile
« Reply #133 on: January 20, 2012, 12:16:33 PM »

There is a large white tent next to them too... 

That'll probably be anti-capitalist protesters evicted from the city...   Grin

Paul
Logged
IndustryInsider
Hero Member
*****
Posts: 3306


View Profile
« Reply #134 on: January 20, 2012, 12:38:14 PM »

Additional sidings should be appearing at Westbourne Park soon which will be used to take excavated soil to Wallesea up to five times a day from the summer onwards.  Routed from Westbourne Park via Park Royal, Drayton Green and Acton bank then down via Clapham.  Presumably these sidings will also take delivery by rail of the concrete tunnel lining segments from the construction site at Old Oak Common?

This press release is well worth a read for more information:
http://www.crossrail.co.uk/news/press-releases/work-underway-at-wallasea-isl-to-receive-excavated-material-from-crossrail-tunnels-next-year
Logged

To view my 'before and after' video comparison of the Cotswold Line Redoubling scheme, and a cab view of the new layout at Reading, see: http://www.dailymotion.com/user/IndustryInsider/1#
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of First Great Western, for customers of First Great Western and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 7 8 [9] 10 11 ... 15
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by a customer of First Great Western, and the views expressed are those of the individual posters concerned. Visit www.firstgreatwestern.co.uk for the official First Great Western website. Please contact the adminstrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link). Forum hosted by Well House Consultants